Determination of ozone removal rates by selected building products using the FLEC emission cell

Citation
Jg. Kleno et al., Determination of ozone removal rates by selected building products using the FLEC emission cell, ENV SCI TEC, 35(12), 2001, pp. 2548-2553
Citations number
23
Categorie Soggetti
Environment/Ecology,"Environmental Engineering & Energy
Journal title
ENVIRONMENTAL SCIENCE & TECHNOLOGY
ISSN journal
0013936X → ACNP
Volume
35
Issue
12
Year of publication
2001
Pages
2548 - 2553
Database
ISI
SICI code
0013-936X(20010615)35:12<2548:DOORRB>2.0.ZU;2-1
Abstract
Ozone removal by 16 aged (older than 1-120 months) but unused building prod ucts or materials was studied in a test system that included the field and laboratory emission cell (FLEC). The ozone removal was studied at 50 +/- 1 ppb ozone, a relative humidity of 50 +/- 5%, a temperature of 21 +/- 2 degr eesC, and an air flow rate of 900 +/- 10 mL min(-1) through the FLEC lair v elocity ca. 3 cm s(-1)). The ozone removal increased rapidly during the fir st 1-2 min and either remained at a constant level or decreased asymptotica lly to reach a steady state-like value. The ozone removal profiles for a gi ven material showed good repeatability during replicate experiments. Ozone deposition velocities for the building products were calculated to be betwe en 0.0007 cm s(-1) (lacquered ash) and 0.8 cm s(-1) (unpainted gypsum board ).