Citation: Ll. Morris et al., ESTIMATES OF FUTURE IMPACTS OF DEGRADING STREAMS IN THE DEEP LOESS SOIL REGION OF WESTERN IOWA ON PRIVATE AND PUBLIC INFRASTRUCTURE COSTS, Engineering geology, 43(4), 1996, pp. 255-264
Authors:
OKA F
SUGITO M
YASHIMA A
TAGUCHI Y
SEKIGUCHI K
Citation: F. Oka et al., ANALYSIS OF STRONG-MOTION RECORDS FROM THE SOUTH HYOGO EARTHQUAKE OF JANUARY 17, 1995, Engineering geology, 43(2-3), 1996, pp. 85-106
Authors:
SHIMIZU I
OSAWA H
SEO T
YASUIKE S
SASAKI S
Citation: I. Shimizu et al., EARTHQUAKE-RELATED GROUND MOTION AND GROUNDWATER PRESSURE CHANGE AT THE KAMAISHI MINE, Engineering geology, 43(2-3), 1996, pp. 107-118
Citation: Le. Vallejo et M. Shettima, FAULT MOVEMENT AND ITS IMPACT ON GROUND DEFORMATIONS AND ENGINEERING STRUCTURES, Engineering geology, 43(2-3), 1996, pp. 119-133
Citation: Y. Kanaori et S. Kawakami, THE 1995 7.2 MAGNITUDE KOBE EARTHQUAKE AND THE ARIMA-TAKATSUKI TECTONIC LINE - IMPLICATIONS OF THE SEISMIC RISK FOR CENTRAL JAPAN, Engineering geology, 43(2-3), 1996, pp. 135-150
Citation: S. Toda et al., THE 1995 KOBE EARTHQUAKE AND PROBLEMS OF EVALUATION OF ACTIVE FAULTS IN JAPAN, Engineering geology, 43(2-3), 1996, pp. 151-167
Citation: M. Matsuzaki et al., MODELING OF THE INTERACTION BETWEEN DESTRUCTIVE INLAND EARTHQUAKES AND LARGE OFF COAST EARTHQUAKES IN CENTRAL AND SOUTH-WEST JAPAN, Engineering geology, 43(2-3), 1996, pp. 169-176
Citation: S. Kawakami et al., A NEW OPPORTUNITY TO DETECT PALEO-EARTHQUAKE EVENTS DATING BACK TO THE PAST 10 MILLENNIA - A RECORD FROM LACUSTRINE SEDIMENT, Engineering geology, 43(2-3), 1996, pp. 177-188
Citation: Cf. Lee, SEISMOTECTONIC ENVIRONMENT AND DESIGN BASIS EARTHQUAKE FOR THE DARLINGTON NUCLEAR-POWER STATION, Engineering geology, 43(2-3), 1996, pp. 189-200
Citation: T. Fukuchi, DIRECT ESR DATING OF FAULT GOUGE USING CLAY-MINERALS AND THE ASSESSMENT OF FAULT ACTIVITY, Engineering geology, 43(2-3), 1996, pp. 201-211
Citation: Am. Lin, INJECTION VEINS OF CRUSHING-ORIGINATED PSEUDOTACHYLYTE AND FAULT GOUGE FORMED DURING SEISMIC FAULTING, Engineering geology, 43(2-3), 1996, pp. 213-224
Citation: Ml. Smith et Re. Williams, EXAMINATION OF METHODS FOR EVALUATING REMINING A MINE WASTE SITE .1. GEOSTATISTICAL CHARACTERIZATION METHODOLOGY, Engineering geology, 43(1), 1996, pp. 11-21
Citation: Ml. Smith et Re. Williams, EXAMINATION OF METHODS FOR EVALUATING REMINING A MINE WASTE SITE .2. INDICATOR KRIGING FOR SELECTIVE REMEDIATION, Engineering geology, 43(1), 1996, pp. 23-30
Citation: Js. Kuma et Ft. Suorineni, A SUGGESTED SOLUTION TO THE BLIND ZONE PROBLEM IN SHALLOW EXPLORATIONSURVEYS, Engineering geology, 43(1), 1996, pp. 57-64
Citation: L. Mualchin, DEVELOPMENT OF THE CALTRANS DETERMINISTIC FAULT AND EARTHQUAKE HAZARDMAP OF CALIFORNIA, Engineering geology, 42(4), 1996, pp. 217-222