Citation: H. Wiklund, BAYESIAN AND REGRESSION APPROACHES TO ONLINE PREDICTION OF RESIDUAL TOOL LIFE, Quality and reliability engineering international, 14(5), 1998, pp. 303-309
Citation: Dp. Durkee et al., SENSITIVITY ANALYSIS OF AVAILABILITY ESTIMATES TO INPUT DATA CHARACTERIZATION USING DESIGN OF EXPERIMENTS, Quality and reliability engineering international, 14(5), 1998, pp. 311-317
Citation: Sk. Yang et Ts. Liu, A PETRI-NET APPROACH TO EARLY FAILURE-DETECTION AND ISOLATION FOR PREVENTIVE MAINTENANCE, Quality and reliability engineering international, 14(5), 1998, pp. 319-330
Authors:
WILLIAMS R
BANNER J
KNOWLES I
DUBE M
NATISHAN M
PECHT M
Citation: R. Williams et al., AN INVESTIGATION OF CANNOT DUPLICATE FAILURES, Quality and reliability engineering international, 14(5), 1998, pp. 331-337
Citation: Sf. Yang, OPTIMAL PROCESS-CONTROL FOR MULTIPLE DEPENDENT SUBPROCESSES, Quality and reliability engineering international, 14(5), 1998, pp. 347-355
Citation: Gw. Lee et al., STABILITY ANALYSIS AND ROBUST DESIGN OF POLYSILICON TFT LOAD 4M SRAM CELL BY STATISTICAL-METHOD, Quality and reliability engineering international, 14(5), 1998, pp. 357-364
Citation: Lk. Chu et al., SERVICE AVAILABILITY OF A RADIO ACCESS TELECOMMUNICATIONS NETWORK, Quality and reliability engineering international, 14(5), 1998, pp. 365-370
Citation: Jg. Ramirez, SOLVING CHALLENGING PROBLEMS USING STATISTICS IN THE SEMICONDUCTOR INDUSTRY, Quality and reliability engineering international, 14(4), 1998, pp. 2-2
Citation: V. Czitrom et al., MATCHING IMPLANT DOSES USING DESIGN OF EXPERIMENTS, Quality and reliability engineering international, 14(4), 1998, pp. 211-217
Citation: W. Taam, A CASE-STUDY ON PROCESS MONITORING FOR SURFACE-FEATURES, Quality and reliability engineering international, 14(4), 1998, pp. 219-226
Citation: M. Church et Ro. Lynch, UTILIZING DESIGN OF EXPERIMENTS, MONTE-CARLO SIMULATIONS AND PARTIAL LEAST-SQUARES IN SNAPBACK ELIMINATION, Quality and reliability engineering international, 14(4), 1998, pp. 227-235
Citation: B. Stefano, USING LINEAR-REGRESSION ANALYSIS AND THE GIBBS SAMPLER TO ESTIMATE THE PROBABILITY OF A PART BEING WITHIN SPECIFICATION, Quality and reliability engineering international, 14(4), 1998, pp. 237-246
Citation: Jp. Card et al., RUN-TO-RUN PROCESS-CONTROL OF A PLASMA ETCH PROCESS WITH NEURAL-NETWORK MODELING, Quality and reliability engineering international, 14(4), 1998, pp. 247-260
Citation: Gc. Runger et Jw. Fowler, RUN-TO-RUN CONTROL CHARTS WITH CONTRASTS, Quality and reliability engineering international, 14(4), 1998, pp. 261-272
Citation: Jd. Stanley et al., A TIME-SERIES APPROACH FOR COMPENSATING FOR ERRORS IN COMPLEX GAUGE SYSTEMS, Quality and reliability engineering international, 14(4), 1998, pp. 273-280
Citation: R. Billinton, RELIABILITY EVALUATION IN MODERN ELECTRIC-POWER SYSTEMS, Quality and reliability engineering international, 14(3), 1998, pp. 121-122
Citation: Im. Hampton et al., RELIABILITY-ANALYSIS OF MTRCS PROPOSED POWER SCADA SYSTEM, Quality and reliability engineering international, 14(3), 1998, pp. 123-127
Citation: Rf. Ghajar, EVALUATION OF THE MARGINAL OUTAGE COSTS IN GENERATING SYSTEMS USING QUANTITATIVE POWER-SYSTEM RELIABILITY TECHNIQUES, Quality and reliability engineering international, 14(3), 1998, pp. 129-136
Citation: M. Fotuhifiruzabad, INTERRUPTIBLE LOAD CONSIDERATIONS IN WELL-BEING ANALYSIS OF INTERCONNECTED SYSTEMS, Quality and reliability engineering international, 14(3), 1998, pp. 137-144
Citation: N. Chowdhury et H. Khonsari, ADEQUACY ASSESSMENT USING A MODIFIED 4-STATE MODEL, Quality and reliability engineering international, 14(3), 1998, pp. 145-151