AAAAAA

   
Results: 1-11 |
Results: 11

Authors: Lee, HWJ Cai, XQ Teo, KL
Citation: Hwj. Lee et al., An optimal control approach to manpower planning problem, MATH PROB E, 7(2), 2001, pp. 155-175

Authors: Zhang, GC Cai, XQ Lee, CY Wong, CK
Citation: Gc. Zhang et al., Minimizing makespan on a single batch processing machine with nonidenticaljob sizes, NAV RES LOG, 48(3), 2001, pp. 226-240

Authors: Zhang, GC Cai, XQ Wong, CK
Citation: Gc. Zhang et al., On-line algorithms for minimizing makespan on batch processing machines, NAV RES LOG, 48(3), 2001, pp. 241-258

Authors: Jin, JY Cui, J Tang, XL Li, SJ Wang, JC Zhao, QS Hua, XY Cai, XQ
Citation: Jy. Jin et al., Polyetherimide-modified bismaleimide resins. II. Effect of polyetherimide content, J APPL POLY, 81(2), 2001, pp. 350-358

Authors: Cai, XQ Lee, CY Wong, TL
Citation: Xq. Cai et al., Multiprocessor task scheduling to minimize the maximum tardiness and the total completion time, IEEE ROBOT, 16(6), 2000, pp. 824-830

Authors: Cai, XQ Zhou, X
Citation: Xq. Cai et X. Zhou, Asymmetric earliness and tardiness scheduling with exponential processing times on an unreliable machine, ANN OPER R, 98, 2000, pp. 313-331

Authors: Zhang, GC Cai, XQ Wong, CK
Citation: Gc. Zhang et al., Linear time-approximation algorithms for bin packing, OPER RES L, 26(5), 2000, pp. 217-222

Authors: Cai, XQ Teo, KL Yang, XQ Zhou, XY
Citation: Xq. Cai et al., Portfolio optimization under a minimax rule, MANAG SCI, 46(7), 2000, pp. 957-972

Authors: Jin, JY Cui, J Tang, XL Ding, YF Li, SJ Wang, JC Zhao, QS Hua, XY Cai, XQ
Citation: Jy. Jin et al., On polyetherimide modified bismaleimide resins, 1 Effect of the chemical backbone of polyetherimide, MACRO CH P, 200(8), 1999, pp. 1956-1960

Authors: Lee, CY Cai, XQ
Citation: Cy. Lee et Xq. Cai, Scheduling one and two-processor tasks on two parallel processors, IIE TRANS, 31(5), 1999, pp. 445-455

Authors: Cai, XQ Zhou, S
Citation: Xq. Cai et S. Zhou, Stochastic scheduling on parallel machines subject to random breakdowns tominimize expected costs for earliness and tardy jobs, OPERAT RES, 47(3), 1999, pp. 422-437
Risultati: 1-11 |