Citation: M. Rahimi et M. Dessouky, A hierarchical task model for dispatching in computer-assisted demand-responsive paratransit operation, ITS J, 6(3), 2001, pp. 199-223
Citation: M. Dessouky et S. Verma, Foreword - Special issue of computers and industrial engineering on mathematical models and their applications for production planning and scheduling, COM IND ENG, 39(3-4), 2001, pp. 217-218
Citation: M. Dessouky et A. Kaiser, Very low-voltage digital-audio Delta Sigma modulator with 88-dB dynamic range using local switch bootstrapping, IEEE J SOLI, 36(3), 2001, pp. 349-355
Citation: M. Dessouky et al., Simultaneous batching and scheduling for chemical processing with earliness and tardiness penalties, PROD OPER M, 8(4), 1999, pp. 433-444
Citation: M. Dessouky et A. Kaiser, Input switch configuration suitable for rail-to-rail operation of switchedopamp circuits, ELECTR LETT, 35(1), 1999, pp. 8-10
Citation: S. Verma et M. Dessouky, Single-machine scheduling of unit-time jobs with earliness and tardiness penalties, MATH OPER R, 23(4), 1998, pp. 930-943
Citation: D. Bommisetty et al., Scheduling collection of recyclable material at Northern Illinois University campus using a two-phase algorithm, COM IND ENG, 35(3-4), 1998, pp. 435-438