Citation: Ma. Sauter et T. Enkawa, CONCEPT FOR MULTIDEVELOPMENT PROJECT AND TEAM ORGANIZATION OF PRODUCTAND PROCESS GENERATIONS, Human factors and ergonomics in manufacturing, 8(4), 1998, pp. 331-349
Authors:
YAMADA K
CHEN CJ
SATOH H
HIROTA T
AOYAGI K
ENKAWA T
OZAKI Y
SEKIGUCHI F
FURUHAMA K
Citation: K. Yamada et al., MAGNETIC-RESONANCE-IMAGING OF RAT HEAD WITH A HIGH-STRENGTH (4.7 T) MAGNETIC-FIELD, Journal of veterinary medical science, 59(4), 1997, pp. 303-306
Citation: A. Torki et al., A COMPETITIVE NEURAL-NETWORK ALGORITHM FOR SOLVING VEHICLE-ROUTING PROBLEM, Computers & industrial engineering, 33(3-4), 1997, pp. 473-476
Citation: S. Somhom et al., A SELF-ORGANIZING MODEL FOR THE TRAVELING SALESMAN PROBLEM, The Journal of the Operational Research Society, 48(9), 1997, pp. 919-928
Citation: A. Torki et al., A LOW-RANK BILINEAR-PROGRAMMING APPROACH FOR SUBOPTIMAL SOLUTION OF THE QUADRATIC ASSIGNMENT PROBLEM, European journal of operational research, 94(2), 1996, pp. 384-391
Citation: Di. Miyake et al., IMPROVING MANUFACTURING SYSTEMS PERFORMANCE BY COMPLEMENTARY APPLICATION OF JUST-IN-TIME, TOTAL QUALITY-CONTROL AND TOTAL PRODUCTIVE MAINTENANCE PARADIGMS, Total quality management, 6(4), 1995, pp. 345-363
Citation: Sh. Zegordi et al., MINIMIZING MAKESPAN FOR FLOW-SHOP SCHEDULING BY COMBINING SIMULATED ANNEALING WITH SEQUENCING KNOWLEDGE, European journal of operational research, 85(3), 1995, pp. 515-531
Citation: Sh. Zegordi et al., KNOWLEDGEABLE SIMULATED ANNEALING SCHEME FOR THE EARLY TARDY FLOW-SHOP SCHEDULING PROBLEM, International Journal of Production Research, 33(5), 1995, pp. 1449-1466
Citation: T. Adachi et al., A CONCURRENT ENGINEERING METHODOLOGY USING ANALOGIES TO JUST-IN-TIME CONCEPTS, International Journal of Production Research, 33(3), 1995, pp. 587-609
Citation: K. Itoh et al., 2FOLD LOOK-AHEAD SEARCH FOR MULTICRITERION JOB-SHOP SCHEDULING, International Journal of Production Research, 31(9), 1993, pp. 2215-2234