AAAAAA

   
Results: 1-9 |
Results: 9

Authors: Hu, CH Egbelu, PJ
Citation: Ch. Hu et Pj. Egbelu, Selection of circulatory loops for patrol vehicles operating in a network, INT J PROD, 39(4), 2001, pp. 579-601

Authors: Arifin, R Egbelu, PJ
Citation: R. Arifin et Pj. Egbelu, Determination of vehicle requirements in automated guided vehicle systems:a statistical approach, PROD PLAN C, 11(3), 2000, pp. 258-270

Authors: Wei, Y Egbelu, PJ
Citation: Y. Wei et Pj. Egbelu, A framework for estimating manufacturing cost from geometric design data, I J COMP IN, 13(1), 2000, pp. 50-63

Authors: Wei, Y Egbelu, PJ
Citation: Y. Wei et Pj. Egbelu, Process alternative generation from product geometric design data, IIE TRANS, 32(1), 2000, pp. 71-82

Authors: Bartolomei-Suarez, SM Egbelu, PJ
Citation: Sm. Bartolomei-suarez et Pj. Egbelu, Quadratic assignment problem QAP with adaptable material handling devices, INT J PROD, 38(4), 2000, pp. 855-873

Authors: Hu, CH Egbelu, PJ
Citation: Ch. Hu et Pj. Egbelu, A framework for the selection of idle vehicle home locations in an automated guided vehicle system, INT J PROD, 38(3), 2000, pp. 543-562

Authors: McKoy, DHC Egbelu, PJ
Citation: Dhc. Mckoy et Pj. Egbelu, Production scheduling in a process and assembly job shop, PROD PLAN C, 10(1), 1999, pp. 76-86

Authors: Seo, Y Egbelu, PJ
Citation: Y. Seo et Pj. Egbelu, Integrated manufacturing planning for an AGV-based FMS, INT J PRO E, 60-1, 1999, pp. 473-478

Authors: Kim, KH Egbelu, PJ
Citation: Kh. Kim et Pj. Egbelu, Scheduling in a production environment with multiple process plans per job, INT J PROD, 37(12), 1999, pp. 2725-2753
Risultati: 1-9 |