Citation: Nf. Puspita et al., SYNTHESIS OF HEAT-EXCHANGER NETWORKS CONSIDERING LOCATION OF PROCESS STREAM SOURCES, Journal of Chemical Engineering of Japan, 31(3), 1998, pp. 330-339
Citation: T. Fuchino et M. Muraki, ESTIMATION OF SHUTDOWN MAINTENANCE COST F OR EVALUATION OF PROCESS DESIGN IN EARLY PLANNING PHASE, Kagaku kogaku ronbunshu, 23(2), 1997, pp. 266-271
Citation: T. Fuchino et al., ARRANGEMENT OF PROCESS EQUIPMENT MODULES WITH CONSIDERATION OF PLANT SAFETY, Journal of Chemical Engineering of Japan, 30(5), 1997, pp. 896-901
Citation: T. Fuchino et al., GROUPING OF BATCHES FOR MEDIUM-TERM PRODUCTION PLANNING OF MULTIPURPOSE BATCH PLANTS, Journal of Chemical Engineering of Japan, 29(1), 1996, pp. 177-180
Citation: T. Fuchino et al., DESIGN OF MULTIPURPOSE BATCH PLANTS WITH MULTIPLE PRODUCTION PLANS BASED ON CYCLIC PRODUCTION, Journal of Chemical Engineering of Japan, 28(5), 1995, pp. 541-550
Citation: T. Fuchino et al., SCHEDULING METHOD IN DESIGN OF MULTIPURPOSE BATCH PLANTS WITH CONSTRAINED RESOURCES, Journal of Chemical Engineering of Japan, 27(3), 1994, pp. 363-368
Authors:
FUCHINO T
YAMAGUCHI K
MURAKI M
HAYAKAWA T
Citation: T. Fuchino et al., EVOLUTIONARY DESIGN METHOD FOR MULTIPURPOSE BATCH PLANTS ON THE BASISOF CYCLIC PRODUCTION, Journal of Chemical Engineering of Japan, 27(1), 1994, pp. 57-64