AAAAAA

   
Results: 1-4 |
Results: 4

Authors: ALBINO V GARAVELLI AC OKOGBAA OG
Citation: V. Albino et al., VULNERABILITY OF PRODUCTION SYSTEMS WITH MULTISUPPLIER NETWORK - A CASE-STUDY, International journal of production research (Print), 36(11), 1998, pp. 3055-3066

Authors: GARAVELLI AC OKOGBAA OG VIOLANTE N
Citation: Ac. Garavelli et al., GLOBAL MANUFACTURING SYSTEMS - A MODEL SUPPORTED BY GENETIC ALGORITHMS TO OPTIMIZE PRODUCTION PLANNING, Computers & industrial engineering, 31(1-2), 1996, pp. 193-196

Authors: ALBINO V GARAVELLI AC
Citation: V. Albino et Ac. Garavelli, A METHODOLOGY FOR THE VULNERABILITY ANALYSIS OF JUST-IN-TIME PRODUCTION SYSTEMS, International journal of production economics, 41(1-3), 1995, pp. 71-80

Authors: GARAVELLI AC PONTRANDOLFO P
Citation: Ac. Garavelli et P. Pontrandolfo, A HEURISTIC METHOD FOR THE ESTIMATION OF THE PROJECT DURATION IN A STOCHASTIC NETWORK SCHEDULING, RAIRO. Recherche operationnelle, 29(3), 1995, pp. 285-298
Risultati: 1-4 |