Citation: D. Golenkoginzburg et A. Gonik, A HEURISTIC FOR NETWORK PROJECT SCHEDULING WITH RANDOM ACTIVITY DURATIONS DEPENDING ON THE RESOURCE-ALLOCATION, International journal of production economics, 55(2), 1998, pp. 149-162
Citation: D. Golenkoginzburg et A. Gonik, HIGH-PERFORMANCE HEURISTIC ALGORITHM FOR CONTROLLING STOCHASTIC NETWORK PROJECTS, International journal of production economics, 54(3), 1998, pp. 235-245
Citation: D. Golenkoginzburg et A. Gonik, USING LOOK-AHEAD TECHNIQUES IN JOB-SHOP SCHEDULING WITH RANDOM OPERATIONS, International journal of production economics, 50(1), 1997, pp. 13-22
Citation: D. Golenkoginzburg et A. Gonik, STOCHASTIC NETWORK PROJECT SCHEDULING WITH NON-CONSUMABLE LIMITED RESOURCES, International journal of production economics, 48(1), 1997, pp. 29-37
Citation: D. Golenkoginzburg et A. Gonik, JOB-SHOP RESOURCE SCHEDULING VIA SIMULATING RANDOM OPERATIONS, Mathematics and computers in simulation, 44(5), 1997, pp. 427-440
Citation: D. Golenkoginzburg et V. Kats, A GENERALIZED CONTROL MODEL FOR MAN-MACHINE PRODUCTION SYSTEMS WITH DISTURBANCES, Computers & industrial engineering, 32(2), 1997, pp. 399-417
Citation: D. Golenkoginzburg et D. Blokh, A GENERALIZED ACTIVITY NETWORK MODEL, The Journal of the Operational Research Society, 48(4), 1997, pp. 391-400
Citation: D. Golenkoginzburg et A. Gonik, ONLINE CONTROL MODEL FOR NETWORK CONSTRUCTION PROJECTS, The Journal of the Operational Research Society, 48(2), 1997, pp. 175-183
Citation: D. Golenkoginzburg et al., HIERARCHICAL DECISION-MAKING MODEL FOR PLANNING AND CONTROLLING STOCHASTIC PROJECTS, International journal of production economics, 46, 1996, pp. 39-54
Citation: D. Golenkoginzburg et al., A MULTILEVEL DECISION-MAKING SYSTEM WITH MULTIPLE RESOURCES FOR CONTROLLING COTTON HARVESTING, International journal of production economics, 46, 1996, pp. 55-63
Citation: D. Golenkoginzburg et A. Gonik, ONLINE CONTROL MODEL FOR COST-SIMULATION NETWORK PROJECTS, The Journal of the Operational Research Society, 47(2), 1996, pp. 266-283
Citation: D. Golenkoginzburg et al., INDUSTRIAL JOB-SHOP SCHEDULING WITH RANDOM OPERATIONS AND DIFFERENT PRIORITIES, International journal of production economics, 40(2-3), 1995, pp. 185-195
Citation: D. Golenkoginzburg, A 2-LEVEL DECISION-MAKING MODEL FOR CONTROLLING STOCHASTIC PROJECTS, International journal of production economics, 32(1), 1993, pp. 117-127
Citation: Z. Sinuanystern et al., ONLINE PRODUCTION CONTROL USING THE EVPI APPROACH, European journal of operational research, 67(3), 1993, pp. 344-357