AAAAAA

   
Results: 1-8 |
Results: 8

Authors: GOLENKOGINZBURG D GONIK A
Citation: D. Golenkoginzburg et A. Gonik, A HEURISTIC FOR NETWORK PROJECT SCHEDULING WITH RANDOM ACTIVITY DURATIONS DEPENDING ON THE RESOURCE-ALLOCATION, International journal of production economics, 55(2), 1998, pp. 149-162

Authors: GOLENKOGINZBURG D GONIK A
Citation: D. Golenkoginzburg et A. Gonik, HIGH-PERFORMANCE HEURISTIC ALGORITHM FOR CONTROLLING STOCHASTIC NETWORK PROJECTS, International journal of production economics, 54(3), 1998, pp. 235-245

Authors: GOLENKOGINZBURG D GONIK A
Citation: D. Golenkoginzburg et A. Gonik, USING LOOK-AHEAD TECHNIQUES IN JOB-SHOP SCHEDULING WITH RANDOM OPERATIONS, International journal of production economics, 50(1), 1997, pp. 13-22

Authors: GOLENKOGINZBURG D GONIK A
Citation: D. Golenkoginzburg et A. Gonik, STOCHASTIC NETWORK PROJECT SCHEDULING WITH NON-CONSUMABLE LIMITED RESOURCES, International journal of production economics, 48(1), 1997, pp. 29-37

Authors: GOLENKOGINZBURG D GONIK A
Citation: D. Golenkoginzburg et A. Gonik, JOB-SHOP RESOURCE SCHEDULING VIA SIMULATING RANDOM OPERATIONS, Mathematics and computers in simulation, 44(5), 1997, pp. 427-440

Authors: GOLENKOGINZBURG D GONIK A
Citation: D. Golenkoginzburg et A. Gonik, ONLINE CONTROL MODEL FOR NETWORK CONSTRUCTION PROJECTS, The Journal of the Operational Research Society, 48(2), 1997, pp. 175-183

Authors: GOLENKOGINZBURG D GONIK A KESLER S
Citation: D. Golenkoginzburg et al., HIERARCHICAL DECISION-MAKING MODEL FOR PLANNING AND CONTROLLING STOCHASTIC PROJECTS, International journal of production economics, 46, 1996, pp. 39-54

Authors: GOLENKOGINZBURG D GONIK A
Citation: D. Golenkoginzburg et A. Gonik, ONLINE CONTROL MODEL FOR COST-SIMULATION NETWORK PROJECTS, The Journal of the Operational Research Society, 47(2), 1996, pp. 266-283
Risultati: 1-8 |