Citation: Sk. Khator et Lc. Leung, POWER DISTRIBUTION PLANNING - A REVIEW OF MODELS AND ISSUES, IEEE transactions on power systems, 12(3), 1997, pp. 1151-1158
Citation: Sk. Khator et Lc. Leung, POWER DISTRIBUTION PLANNING - A REVIEW OF MODELS AND ISSUES - DISCUSSION, IEEE transactions on power systems, 12(3), 1997, pp. 1159-1159
Citation: Ka. Dsouza et Sk. Khator, SYSTEM RECONFIGURATION TO AVOID DEADLOCKS IN AUTOMATED MANUFACTURING SYSTEMS, Computers & industrial engineering, 32(2), 1997, pp. 455-465
Citation: Vf. Silveira et al., AN INFORMATION MANAGEMENT-SYSTEM FOR FORECASTING ENVIRONMENTAL-CHANGE, Computers & industrial engineering, 31(1-2), 1996, pp. 289-292
Citation: Jcr. Vieira et al., PORTFOLIO SELECTION THROUGH MATHEMATICAL-PROGRAMMING IN CAD ENVIRONMENT, Computers & industrial engineering, 31(1-2), 1996, pp. 351-354
Citation: As. Kashyap et Sk. Khator, ANALYSIS OF TOOL SHARING IN AN FMS - A SIMULATION STUDY, Computers & industrial engineering, 30(1), 1996, pp. 137-145
Citation: Sk. Maheshwari et Sk. Khator, SIMULTANEOUS EVALUATION AND SELECTION OF STRATEGIES FOR LOADING AND CONTROLLING MACHINES AND MATERIAL HANDLING-SYSTEM IN FMS, International journal of computer integrated manufacturing, 8(5), 1995, pp. 340-356
Citation: Lc. Leung et al., PLANNING SUBSTATION CAPACITY UNDER THE SINGLE-CONTINGENCY SCENARIO, IEEE transactions on power systems, 10(3), 1995, pp. 1442-1447
Citation: Lc. Leung et Sk. Khator, TRANSFORMER PROCUREMENT AND RELOCATION AT A LARGE ELECTRIC UTILITY - A MIXED 0-1-LINEAR-PROGRAMMING MODEL, IEEE transactions on power systems, 10(2), 1995, pp. 957-963
Citation: Ak. Sarada et al., DISTRIBUTION PLANNING IN AN ELECTRIC UTILITY - FEEDER CONFIGURATIONS, Computers & industrial engineering, 28(2), 1995, pp. 329-339
Citation: Ka. Dsouza et Sk. Khator, A PETRI-NET APPROACH FOR MODELING CONTROLS OF A COMPUTER-INTEGRATED ASSEMBLY CELL, International journal of computer integrated manufacturing, 6(5), 1993, pp. 302-310
Citation: Sm. Benmakhlouf et Sk. Khator, SMART LIFTS - CONTROL DESIGN AND PERFORMANCE EVALUATION, Computers & industrial engineering, 25(1-4), 1993, pp. 175-178
Citation: P. Nayyar et Sk. Khator, OPERATIONAL CONTROL OF MULTI-LOAD VEHICLES IN AN AUTOMATED GUIDED VEHICLE SYSTEM, Computers & industrial engineering, 25(1-4), 1993, pp. 503-506
Citation: As. Kashyap et Sk. Khator, CONTROL RULES FOR TOOL SHARING IN FLEXIBLE MANUFACTURING SYSTEMS, Computers & industrial engineering, 25(1-4), 1993, pp. 507-510