Citation: K. Kogan et E. Khmelnitsky, TRACKING DEMANDS IN OPTIMAL-CONTROL OF MANAGERIAL SYSTEMS WITH CONTINUOUSLY-DIVISIBLE, DOUBLY CONSTRAINED RESOURCES, Journal of global optimization, 13(1), 1998, pp. 43-59
Citation: K. Kogan et al., BALANCING FACILITIES IN AGGREGATE PRODUCTION PLANNING - MAKE-TO-ORDERAND MAKE-TO-STOCK ENVIRONMENTS, International Journal of Production Research, 36(9), 1998, pp. 2585-2596
Citation: E. Khmelnitsky et M. Caramanis, ONE-MACHINE N-PART-TYTPE OPTIMAL SETUP SCHEDULING - ANALYTICAL CHARACTERIZATION OF SWITCHING SURFACES, IEEE transactions on automatic control, 43(11), 1998, pp. 1584-1588
Citation: K. Kogan et al., OPTIMAL FLOW-CONTROL OF FLEXIBLE MANUFACTURING SYSTEMS - SETUP LOCALIZATION BY AN ITERATIVE PROCEDURE, International journal of production economics, 51(1-2), 1997, pp. 37-46
Citation: E. Khmelnitsky et al., MAXIMUM PRINCIPLE-BASED METHODS FOR PRODUCTION SCHEDULING WITH PARTIALLY SEQUENCE-DEPENDENT SETUPS, International Journal of Production Research, 35(10), 1997, pp. 2701-2712
Citation: E. Khmelnitsky et K. Kogan, OPTIMAL POLICIES FOR AGGREGATE PRODUCTION AND CAPACITY PLANNING UNDERRAPIDLY CHANGING DEMAND CONDITIONS, International Journal of Production Research, 34(7), 1996, pp. 1929-1941
Citation: K. Kogan et E. Khmelnitsky, AN OPTIMAL-CONTROL MODEL FOR CONTINUOUS-TIME PRODUCTION AND SETUP SCHEDULING, International Journal of Production Research, 34(3), 1996, pp. 715-725
Citation: E. Khmelnitsky et al., A MAXIMUM PRINCIPLE BASED COMBINED METHOD FOR SCHEDULING IN A FLEXIBLE MANUFACTURING SYSTEM, Discrete event dynamic systems, 5(4), 1995, pp. 343-355
Citation: K. Kogan et E. Khmelnitsky, AN OPTIMAL-CONTROL METHOD FOR AGGREGATE PRODUCTION PLANNING IN LARGE-SCALE MANUFACTURING SYSTEMS WITH CAPACITY EXPANSION AND DETERIORATION, Computers & industrial engineering, 28(4), 1995, pp. 851-859
Citation: E. Khmelnitsky et K. Kogan, NECESSARY OPTIMALITY CONDITIONS FOR A GENERALIZED PROBLEM OF PRODUCTION SCHEDULING, Optimal control applications & methods, 15(3), 1994, pp. 215-222