Citation: D. Dhamija et al., DEVELOPMENT OF A UNIFIED DATA META-MODEL FOR CAD-CAPP-MRP-NC VERIFICATION INTEGRATION, Computers & industrial engineering, 33(1-2), 1997, pp. 19-22
Citation: Da. Koonce et al., MANUFACTURING SYSTEMS-ENGINEERING AND DESIGN - AN INTELLIGENT, MULTIMODEL, INTEGRATION ARCHITECTURE, International journal of computer integrated manufacturing, 9(6), 1996, pp. 443-453
Citation: Da. Koonce et M. Rowe, A FORMAL METHODOLOGY FOR INFORMATION MODEL LEVEL INTEGRATION IN CIM SYSTEMS, Computers & industrial engineering, 31(1-2), 1996, pp. 277-280
Citation: P. Dreer et Da. Koonce, INTEGRATION EXTENSION FOR COMPUTER-INTEGRATED MANUFACTURING APPLICATIONS, Computers & industrial engineering, 31(1-2), 1996, pp. 281-284
Citation: P. Dreer et Da. Koonce, DEVELOPMENT OF AN INTEGRATED INFORMATION MODEL FOR COMPUTER-INTEGRATED MANUFACTURING, Computers & industrial engineering, 29, 1995, pp. 109-112
Citation: Da. Koonce, INFORMATION MODEL LEVEL INTEGRATION FOR CIM SYSTEMS - A UNIFIED DATABASE APPROACH TO CONCURRENT ENGINEERING, Computers & industrial engineering, 29, 1995, pp. 647-651
Authors:
PARKS CM
KOONCE DA
RABELO LC
JUDD RP
SAUTER JA
Citation: Cm. Parks et al., MODEL-BASED MANUFACTURING INTEGRATION - A PARADIGM FOR VIRTUAL MANUFACTURING SYSTEMS-ENGINEERING, Computers & industrial engineering, 27(1-4), 1994, pp. 357-360
Citation: Da. Koonce et al., A DYNAMIC, REALTIME APPROACH TO LONG-DURATION MANUFACTURING SCHEDULE MONITORING AND CONTROL, Computers & industrial engineering, 26(4), 1994, pp. 619-631
Citation: Da. Koonce et al., A DYNAMIC, REALTIME APPROACH TO LONG-DURATION MANUFACTURING SCHEDULE MONITORING AND CONTROL, Computers & industrial engineering, 26(4), 1994, pp. 619-631