AAAAAA

   
Results: 1-14 |
Results: 14

Authors: KUBIAK W VANDEVELDE S
Citation: W. Kubiak et S. Vandevelde, SCHEDULING DETERIORATING JOBS TO MINIMIZE MAKESPAN, Naval research logistics, 45(5), 1998, pp. 511-523

Authors: GORDON V KUBIAK W
Citation: V. Gordon et W. Kubiak, SINGLE-MACHINE SCHEDULING WITH RELEASE AND DUE-DATE ASSIGNMENT TO MINIMIZE THE WEIGHTED NUMBER OF LATE JOBS, Information processing letters, 68(3), 1998, pp. 153-159

Authors: JURISCH B KUBIAK W JOZEFOWSKA J
Citation: B. Jurisch et al., ALGORITHMS FOR MINCLIQUE SCHEDULING PROBLEMS, Discrete applied mathematics, 72(1-2), 1997, pp. 115-139

Authors: JURISCH B KUBIAK W
Citation: B. Jurisch et W. Kubiak, 2-MACHINE OPEN SHOPS WITH RENEWABLE RESOURCES, Operations research, 45(4), 1997, pp. 544-552

Authors: DROR M KUBIAK W DELLOLMO P
Citation: M. Dror et al., SCHEDULING CHAINS TO MINIMIZE MEAN FLOW TIME, Information processing letters, 61(6), 1997, pp. 297-301

Authors: PIETRZAK I BACZYK K KUBIAK W
Citation: I. Pietrzak et al., RECOMBINANT-HUMAN-ERYTHROPOIETIN IMPROVES ENZYME-ACTIVITY IN ERYTHROCYTES OF PREDIALYSIS UREMICS, Mineral and electrolyte metabolism, 22(1-3), 1996, pp. 102-105

Authors: KUBIAK W TIMKOVSKY V
Citation: W. Kubiak et V. Timkovsky, TOTAL COMPLETION-TIME MINIMIZATION IN 2-MACHINE JOB SHOPS WITH UNIT-TIME OPERATIONS, European journal of operational research, 94(2), 1996, pp. 310-320

Authors: KUBIAK W LOU SXC WANG YM
Citation: W. Kubiak et al., MEAN FLOW TIME MINIMIZATION IN REENTRANT JOB SHOPS WITH A HUB, Operations research, 44(5), 1996, pp. 764-776

Authors: KUBIAK W
Citation: W. Kubiak, NEW RESULTS ON THE COMPLETION-TIME VARIANCE MINIMIZATION, Discrete applied mathematics, 58(2), 1995, pp. 157-168

Authors: SETHI SP KUBIAK W
Citation: Sp. Sethi et W. Kubiak, COMPLEXITY OF A CLASS OF NONLINEAR COMBINATORIAL PROBLEMS RELATED TO THEIR LINEAR COUNTERPARTS, European journal of operational research, 73(3), 1994, pp. 569-576

Authors: JOZEFOWSKA J JURISCH B KUBIAK W
Citation: J. Jozefowska et al., SCHEDULING SHOPS TO MINIMIZE THE WEIGHTED NUMBER OF LATE JOBS, Operations research letters, 16(5), 1994, pp. 277-283

Authors: BLAZEWICZ J KUBIAK W MARTELLO S
Citation: J. Blazewicz et al., ALGORITHMS FOR MINIMIZING MAXIMUM LATENESS WITH UNIT LENGTH TASKS ANDRESOURCE CONSTRAINTS, Discrete applied mathematics, 42(2-3), 1993, pp. 123-138

Authors: KUBIAK W
Citation: W. Kubiak, MINIMIZING VARIATION OF PRODUCTION-RATES IN JUST-IN-TIME SYSTEMS - A SURVEY, European journal of operational research, 66(3), 1993, pp. 259-271

Authors: KUBIAK W
Citation: W. Kubiak, COMPLETION-TIME VARIANCE MINIMIZATION ON A SINGLE-MACHINE IS DIFFICULT, Operations research letters, 14(1), 1993, pp. 49-59
Risultati: 1-14 |