AAAAAA

   
Results: 1-25 | 26-45 |
Results: 26-45/45

Authors: KUSIAK A LEE H
Citation: A. Kusiak et H. Lee, NEURAL COMPUTING-BASED DESIGN OF COMPONENTS FOR CELLULAR MANUFACTURING, International Journal of Production Research, 34(7), 1996, pp. 1777-1790

Authors: HE DW KUSIAK A
Citation: Dw. He et A. Kusiak, PERFORMANCE ANALYSIS OF MODULAR PRODUCTS, International Journal of Production Research, 34(1), 1996, pp. 253-272

Authors: FENG CX HUANG CC KUSIAK A LI PG
Citation: Cx. Feng et al., REPRESENTATION OF FUNCTIONS AND FEATURES IN DETAIL DESIGN, Computer Aided Design, 28(12), 1996, pp. 961-971

Authors: FENG CX KUSIAK A HUANG CC
Citation: Cx. Feng et al., COST EVALUATION IN DESIGN WITH FORM FEATURES, Computer Aided Design, 28(11), 1996, pp. 879-885

Authors: KUSIAK A WANG JR HE DW FENG CX
Citation: A. Kusiak et al., A STRUCTURED APPROACH FOR ANALYSIS OF DESIGN PROCESSES, IEEE transactions on components, packaging, and manufacturing technology. Part A, 18(3), 1995, pp. 664-673

Authors: KUSIAK A LARSON N
Citation: A. Kusiak et N. Larson, DECOMPOSITION AND REPRESENTATION METHODS IN MECHANICAL DESIGN, Journal of mechnical design, 117, 1995, pp. 17-24

Authors: LARSON N KUSIAK A
Citation: N. Larson et A. Kusiak, WORK-IN-PROCESS SPACE ALLOCATION - A MODEL AND AN INDUSTRIAL APPLICATION, IIE transactions, 27(4), 1995, pp. 497-506

Authors: VUJOSEVIC R KUSIAK A SZCZERBICKI E
Citation: R. Vujosevic et al., REASON MAINTENANCE IN PRODUCT MODELING, Journal of engineering for industry, 117(2), 1995, pp. 223-231

Authors: KUSIAK A WANG JT
Citation: A. Kusiak et Jt. Wang, DEPENDENCY ANALYSIS IN CONSTRAINT NEGOTIATION, IEEE transactions on systems, man, and cybernetics, 25(9), 1995, pp. 1301-1313

Authors: BELHE U KUSIAK A
Citation: U. Belhe et A. Kusiak, RESOURCE CONSTRAINED SCHEDULING OF HIERARCHICALLY STRUCTURED DESIGN ACTIVITY NETWORKS, IEEE transactions on engineering management, 42(2), 1995, pp. 150-158

Authors: FENG CX KUSIAK A
Citation: Cx. Feng et A. Kusiak, CONSTRAINT-BASED DESIGN OF PARTS, Computer Aided Design, 27(5), 1995, pp. 343-352

Authors: KUSIAK A FENG CX
Citation: A. Kusiak et Cx. Feng, DETERMINISTIC TOLERANCE SYNTHESIS - A COMPARATIVE-STUDY, Computer Aided Design, 27(10), 1995, pp. 759-768

Authors: KUSIAK A HE WH
Citation: A. Kusiak et Wh. He, DESIGN OF COMPONENTS FOR SCHEDULABILITY, European journal of operational research, 76(1), 1994, pp. 49-59

Authors: KUSIAK A LARSON TN WANG JR
Citation: A. Kusiak et al., REENGINEERING OF DESIGN AND MANUFACTURING PROCESSES, Computers & industrial engineering, 26(3), 1994, pp. 521-536

Authors: CHUNG YK KUSIAK A
Citation: Yk. Chung et A. Kusiak, GROUPING PARTS WITH A NEURAL-NETWORK, Journal of manufacturing systems, 13(4), 1994, pp. 262-275

Authors: HARGROVE SK KUSIAK A
Citation: Sk. Hargrove et A. Kusiak, COMPUTER-AIDED FIXTURE DESIGN - A REVIEW, International Journal of Production Research, 32(4), 1994, pp. 733-753

Authors: KUSIAK A WANG J
Citation: A. Kusiak et J. Wang, DECOMPOSITION OF THE DESIGN PROCESS, Journal of mechnical design, 115(4), 1993, pp. 687-695

Authors: AHN JY HE WH KUSIAK A
Citation: Jy. Ahn et al., SCHEDULING WITH ALTERNATIVE OPERATIONS, IEEE transactions on robotics and automation, 9(3), 1993, pp. 297-303

Authors: KUSIAK A SZCZERBICKI E
Citation: A. Kusiak et E. Szczerbicki, TRANSFORMATION FROM CONCEPTUAL TO EMBODIMENT DESIGN, IIE transactions, 25(4), 1993, pp. 6-12

Authors: KUSIAK A BOE WJ CHENG CH
Citation: A. Kusiak et al., DESIGNING CELLULAR MANUFACTURING SYSTEMS - BRANCH-AND-BOUND AND A-ASTERISK APPROACHES, IIE transactions, 25(4), 1993, pp. 46-56
Risultati: 1-25 | 26-45 |