Login
|
New Account
AAAAAA
ITA
ENG
Results:
1-5
|
Results: 5
A high-speed reallocation algorithm for controlling man-machine productionsystems
Authors:
Golenko-Ginzburg, D Kats, V Papic, L
Citation:
D. Golenko-ginzburg et al., A high-speed reallocation algorithm for controlling man-machine productionsystems, PROD PLAN C, 11(3), 2000, pp. 271-280
Cyclic scheduling in robotic flowshops
Authors:
Crama, Y Kats, V van de Klundert, J Levner, E
Citation:
Y. Crama et al., Cyclic scheduling in robotic flowshops, ANN OPER R, 96, 2000, pp. 97-124
Control of the three-level "man-computer" production system
Authors:
Golenko-Ginzburg, D Kats, V Sitnyakovskii, S Itskovich, EL
Citation:
D. Golenko-ginzburg et al., Control of the three-level "man-computer" production system, AUT REMOT R, 61(5), 2000, pp. 866-882
Multiple-part cyclic hoist scheduling using a sieve method (vol 15, pg 704, 1999)
Authors:
Kats, V Levner, E Meyzin, L
Citation:
V. Kats et al., Multiple-part cyclic hoist scheduling using a sieve method (vol 15, pg 704, 1999), IEEE ROBOT, 15(6), 1999, pp. 1146-1146
Multiple-part cyclic hoist scheduling using a sieve method
Authors:
Kats, V Levner, E Meyzin, L
Citation:
V. Kats et al., Multiple-part cyclic hoist scheduling using a sieve method, IEEE ROBOT, 15(4), 1999, pp. 704-713
Risultati:
1-5
|