AAAAAA

   
Results: 1-5 |
Results: 5

Authors: Golenko-Ginzburg, D Kats, V Papic, L
Citation: D. Golenko-ginzburg et al., A high-speed reallocation algorithm for controlling man-machine productionsystems, PROD PLAN C, 11(3), 2000, pp. 271-280

Authors: Crama, Y Kats, V van de Klundert, J Levner, E
Citation: Y. Crama et al., Cyclic scheduling in robotic flowshops, ANN OPER R, 96, 2000, pp. 97-124

Authors: Golenko-Ginzburg, D Kats, V Sitnyakovskii, S Itskovich, EL
Citation: D. Golenko-ginzburg et al., Control of the three-level "man-computer" production system, AUT REMOT R, 61(5), 2000, pp. 866-882

Authors: Kats, V Levner, E Meyzin, L
Citation: V. Kats et al., Multiple-part cyclic hoist scheduling using a sieve method (vol 15, pg 704, 1999), IEEE ROBOT, 15(6), 1999, pp. 1146-1146

Authors: Kats, V Levner, E Meyzin, L
Citation: V. Kats et al., Multiple-part cyclic hoist scheduling using a sieve method, IEEE ROBOT, 15(4), 1999, pp. 704-713
Risultati: 1-5 |