AAAAAA

   
Results: 1-13 |
Results: 13

Authors: LEACHMAN RC
Citation: Rc. Leachman, CLOSED-LOOP MEASUREMENT OF EQUIPMENT EFFICIENCY AND EQUIPMENT CAPACITY, IEEE transactions on semiconductor manufacturing, 10(1), 1997, pp. 84-97

Authors: DESSOUKY MM LEACHMAN RC
Citation: Mm. Dessouky et Rc. Leachman, DYNAMIC-MODELS OF PRODUCTION WITH MULTIPLE OPERATIONS AND GENERAL PROCESSING TIMES, The Journal of the Operational Research Society, 48(6), 1997, pp. 647-654

Authors: LEACHMAN RC HODGES DA
Citation: Rc. Leachman et Da. Hodges, BENCHMARKING SEMICONDUCTOR MANUFACTURING, IEEE transactions on semiconductor manufacturing, 9(2), 1996, pp. 158-169

Authors: HUNG YF LEACHMAN RC
Citation: Yf. Hung et Rc. Leachman, A PRODUCTION PLANNING METHODOLOGY FOR SEMICONDUCTOR MANUFACTURING BASED ON ITERATIVE SIMULATION AND LINEAR-PROGRAMMING CALCULATIONS, IEEE transactions on semiconductor manufacturing, 9(2), 1996, pp. 257-269

Authors: KIM J LEACHMAN RC SUH B
Citation: J. Kim et al., DYNAMIC RELEASE CONTROL POLICY FOR THE SEMICONDUCTOR WAFER FABRICATION LINES, The Journal of the Operational Research Society, 47(12), 1996, pp. 1516-1525

Authors: LEACHMAN RC BENSON RF LIU CW RAAR DJ
Citation: Rc. Leachman et al., IMPRESS - AN AUTOMATED PRODUCTION-PLANNING AND DELIVERY-QUOTATION SYSTEM AT HARRIS-CORPORATION - SEMICONDUCTOR SECTOR, Interfaces, 26(1), 1996, pp. 6-37

Authors: DESSOUKY MM LEACHMAN RC
Citation: Mm. Dessouky et Rc. Leachman, A SIMULATION MODELING METHODOLOGY FOR ANALYZING LARGE COMPLEX RAIL NETWORKS, Simulation, 65(2), 1995, pp. 131-142

Authors: GASCON A LEACHMAN RC LEFRANCOIS P
Citation: A. Gascon et al., A NOTE ON IMPROVING THE PERFORMANCE OF THE ENHANCED DYNAMIC CYCLE LENGTHS HEURISTIC FOR THE MULTIITEM, SINGLE-MACHINE SCHEDULING PROBLEM, International Journal of Production Research, 33(3), 1995, pp. 869-873

Authors: KIM JS LEACHMAN RC
Citation: Js. Kim et Rc. Leachman, DECOMPOSITION METHOD APPLICATION TO A LARGE-SCALE LINEAR-PROGRAMMING WIP PROJECTION MODEL, European journal of operational research, 74(1), 1994, pp. 152-160

Authors: GONCALVES JF LEACHMAN RC GASCON A XIONG ZK
Citation: Jf. Goncalves et al., A HEURISTIC SCHEDULING POLICY FOR MULTIITEM, MULTIMACHINE PRODUCTION SYSTEMS WITH TIME-VARYING, STOCHASTIC DEMANDS, Management science, 40(11), 1994, pp. 1455-1468

Authors: GASCON A LEACHMAN RC LEFRANCOIS P
Citation: A. Gascon et al., MULTIITEM, SINGLE-MACHINE SCHEDULING PROBLEM WITH STOCHASTIC DEMANDS - A COMPARISON OF HEURISTICS, International Journal of Production Research, 32(3), 1994, pp. 583-596

Authors: WENG WW LEACHMAN RC
Citation: Ww. Weng et Rc. Leachman, AN IMPROVED METHODOLOGY FOR REAL-TIME PRODUCTION DECISIONS AT BATCH-PROCESS WORK STATIONS, IEEE transactions on semiconductor manufacturing, 6(3), 1993, pp. 219-225

Authors: LEACHMAN RC GASCON A XIONG ZK
Citation: Rc. Leachman et al., MULTIITEM SINGLE-MACHINE SCHEDULING WITH MATERIAL SUPPLY CONSTRAINTS, The Journal of the Operational Research Society, 44(11), 1993, pp. 1145-1154
Risultati: 1-13 |