AAAAAA

   
Results: 1-17 |
Results: 17

Authors: LEUNG LC YIU MK MAN CW CHAN WH LEE KW LAU KW
Citation: Lc. Leung et al., LAPAROSCOPIC MANAGEMENT OF TENCHKOFF CATHETERS IN CONTINUOUS AMBULATORY PERITONEAL-DIALYSIS - A ONE-PORT TECHNIQUE, Surgical endoscopy, 12(6), 1998, pp. 891-893

Authors: MILLER WA LEUNG LC AZHAR TM SARGENT S
Citation: Wa. Miller et al., FUZZY PRODUCTION PLANNING-MODEL FOR FRESH TOMATO PACKING, International journal of production economics, 53(3), 1997, pp. 227-238

Authors: KHATOR SK LEUNG LC
Citation: Sk. Khator et Lc. Leung, POWER DISTRIBUTION PLANNING - A REVIEW OF MODELS AND ISSUES, IEEE transactions on power systems, 12(3), 1997, pp. 1151-1158

Authors: KHATOR SK LEUNG LC
Citation: Sk. Khator et Lc. Leung, POWER DISTRIBUTION PLANNING - A REVIEW OF MODELS AND ISSUES - DISCUSSION, IEEE transactions on power systems, 12(3), 1997, pp. 1159-1159

Authors: LEUNG TW WONG VYW WONG CM TUNG SY LUI CMM LEUNG LC SAIKI O
Citation: Tw. Leung et al., HIGH-DOSE-RATE BRACHYTHERAPY FOR CARCINOMA OF THE ORAL TONGUE, International journal of radiation oncology, biology, physics, 39(5), 1997, pp. 1113-1120

Authors: LEE KW LEUNG KF WONG KK LAU KY LAI KC LEUNG SK LEUNG LC LAU KW
Citation: Kw. Lee et al., ONE-STAGE THORACOSCOPIC ESOPHAGECTOMY - LIGATURE INTRATHORACIC STAPLED ANASTOMOSIS, Australian and New Zealand journal of surgery, 67(2-3), 1997, pp. 131-132

Authors: LEUNG LC KHATOR SK PONCE J
Citation: Lc. Leung et al., OPTIMAL TRANSFORMER ALLOCATION UNDER SINGLE-CONTINGENCY, IEEE transactions on power systems, 11(2), 1996, pp. 1046-1051

Authors: LEUNG KF LEE KW CHEUNG TY LEUNG LC LAU KW
Citation: Kf. Leung et al., LAPAROSCOPIC CHOLECYSTECTOMY - 2-PORT TECHNIQUE, Endoscopy, 28(6), 1996, pp. 505-507

Authors: LEUNG LC WONG CY WONG CM CHEUNG KK
Citation: Lc. Leung et al., CHOLEDOCHOLITHIASIS IN ANOMALOUS BILIARY SYSTEM, Australian and New Zealand journal of surgery, 66(6), 1996, pp. 416-417

Authors: LEUNG LC KHATOR SK SCHNEPP JC
Citation: Lc. Leung et al., PLANNING SUBSTATION CAPACITY UNDER THE SINGLE-CONTINGENCY SCENARIO, IEEE transactions on power systems, 10(3), 1995, pp. 1442-1447

Authors: LEUNG LC KHATOR SK
Citation: Lc. Leung et Sk. Khator, TRANSFORMER PROCUREMENT AND RELOCATION AT A LARGE ELECTRIC UTILITY - A MIXED 0-1-LINEAR-PROGRAMMING MODEL, IEEE transactions on power systems, 10(2), 1995, pp. 957-963

Authors: SARADA AK KHATOR SK LEUNG LC
Citation: Ak. Sarada et al., DISTRIBUTION PLANNING IN AN ELECTRIC UTILITY - FEEDER CONFIGURATIONS, Computers & industrial engineering, 28(2), 1995, pp. 329-339

Authors: KHATOR SK LEUNG LC
Citation: Sk. Khator et Lc. Leung, INTERMEDIATE TOOL REQUIREMENT PLANNING FOR FMS, Journal of manufacturing systems, 13(1), 1994, pp. 9-19

Authors: SINGH N VASHI BI LEUNG LC
Citation: N. Singh et al., 3-DIMENSIONAL NUMERICAL-SIMULATION OF CURRENT COLLECTION BY A PROBE IN A MAGNETIZED PLASMA, Geophysical research letters, 21(9), 1994, pp. 833-836

Authors: HUI YV LEUNG LC HUANG JS
Citation: Yv. Hui et al., ANALYSIS OF CORRELATED RISKY CASH FLOW, International journal of production economics, 32(3), 1993, pp. 269-276

Authors: LEUNG SK CHEUNG HY LEUNG LC
Citation: Sk. Leung et al., CAR-CRUSHER COLON, British Journal of Surgery, 80(11), 1993, pp. 1491-1491

Authors: NG WT LEE K KONG CK CHEUNG CH LEUNG LC
Citation: Wt. Ng et al., LIGATURE VERSUS PURSE STRING FOR SURGICAL STAPLED ANASTOMOSES, Australian and New Zealand journal of surgery, 63(8), 1993, pp. 651-652
Risultati: 1-17 |