AAAAAA

   
Results: 1-15 |
Results: 15

Authors: BRAHA D MAIMON O
Citation: D. Braha et O. Maimon, THE MEASUREMENT OF A DESIGN STRUCTURAL AND FUNCTIONAL COMPLEXITY, IEEE transactions on systems, man and cybernetics. Part A. Systems and humans, 28(4), 1998, pp. 527-535

Authors: BRAHA D MAIMON O
Citation: D. Braha et O. Maimon, THE DESIGN PROCESS - PROPERTIES, PARADIGMS, AND STRUCTURE (VOL 27, PG146, 1997), IEEE transactions on systems, man and cybernetics. Part A. Systems and humans, 28(4), 1998, pp. 542-542

Authors: SHMILOVICI A MAIMON O
Citation: A. Shmilovici et O. Maimon, ON THE SOLUTION OF DIFFERENTIAL-EQUATIONS WITH FUZZY SPLINE-WAVELETS, Fuzzy sets and systems, 96(1), 1998, pp. 77-99

Authors: KOGAN K KHMELNITSKY E MAIMON O
Citation: K. Kogan et al., BALANCING FACILITIES IN AGGREGATE PRODUCTION PLANNING - MAKE-TO-ORDERAND MAKE-TO-STOCK ENVIRONMENTS, International Journal of Production Research, 36(9), 1998, pp. 2585-2596

Authors: BRAHA D MAIMON O
Citation: D. Braha et O. Maimon, THE DESIGN PROCESS - PROPERTIES, PARADIGMS, AND STRUCTURE, IEEE transactions on systems, man and cybernetics. Part A. Systems and humans, 27(2), 1997, pp. 146-166

Authors: MAIMON O LAST M
Citation: O. Maimon et M. Last, INFORMATION-EFFICIENT CONTROL OF DISCRETE-EVENT STOCHASTIC-SYSTEMS, IEEE transactions on systems, man and cybernetics. Part A. Systems and humans, 27(1), 1997, pp. 23-33

Authors: KOGAN K KHMELNITSKY E SHTUB A MAIMON O
Citation: K. Kogan et al., OPTIMAL FLOW-CONTROL OF FLEXIBLE MANUFACTURING SYSTEMS - SETUP LOCALIZATION BY AN ITERATIVE PROCEDURE, International journal of production economics, 51(1-2), 1997, pp. 37-46

Authors: DASKIN MS MAIMON O SHTUB A BRAHA D
Citation: Ms. Daskin et al., GROUPING COMPONENTS IN PRINTED-CIRCUIT BOARD ASSEMBLY WITH LIMITED COMPONENT STAGING CAPACITY AND SINGLE CARD SETUP - PROBLEM CHARACTERISTICS AND SOLUTION PROCEDURES, International Journal of Production Research, 35(6), 1997, pp. 1617-1638

Authors: KHMELNITSKY E KOGAN K MAIMON O
Citation: E. Khmelnitsky et al., MAXIMUM PRINCIPLE-BASED METHODS FOR PRODUCTION SCHEDULING WITH PARTIALLY SEQUENCE-DEPENDENT SETUPS, International Journal of Production Research, 35(10), 1997, pp. 2701-2712

Authors: MAIMON O BRAHA D
Citation: O. Maimon et D. Braha, ON THE COMPLEXITY OF THE DESIGN SYNTHESIS PROBLEM, IEEE transactions on systems, man and cybernetics. Part A. Systems and humans, 26(1), 1996, pp. 142-151

Authors: KHMELNITSKY E KOGAN K MAIMON O
Citation: E. Khmelnitsky et al., A MAXIMUM PRINCIPLE BASED COMBINED METHOD FOR SCHEDULING IN A FLEXIBLE MANUFACTURING SYSTEM, Discrete event dynamic systems, 5(4), 1995, pp. 343-355

Authors: MAIMON O DAYAGI A
Citation: O. Maimon et A. Dayagi, NESTING PLANNING BASED ON PRODUCTION PRIORITIES AND TECHNOLOGICAL EFFICIENCY, European journal of operational research, 80(1), 1995, pp. 121-129

Authors: LEVNER E KOGAN K MAIMON O
Citation: E. Levner et al., FLOWSHOP SCHEDULING OF ROBOTIC CELLS WITH JOB-DEPENDENT TRANSPORTATION AND SET-UP EFFECTS, The Journal of the Operational Research Society, 46(12), 1995, pp. 1447-1455

Authors: MAIMON O LAST M
Citation: O. Maimon et M. Last, INFORMATION-EFFICIENT ROBOTIC CONTROL, Robotica, 12, 1994, pp. 157-163

Authors: KAPITANOVSKY A MAIMON O
Citation: A. Kapitanovsky et O. Maimon, ROBOT PROGRAMMING SYSTEM FOR ASSEMBLY - CONCEPTUAL GRAPH-BASED APPROACH, Journal of intelligent & robotic systems, 8(1), 1993, pp. 35-62
Risultati: 1-15 |