Citation: J. Chang et al., EVOLUTION OF MICROSTRUCTURE AND TENSILE-STRENGTH OF RAPIDLY SOLIDIFIED AL 4.7 PCT ZN 2.5 PCT MG 0.2 PCT ZR X WT PCT MN ALLOYS, Metallurgical and materials transactions. A, Physical metallurgy andmaterials science, 29(7), 1998, pp. 1873-1882
Citation: I. Moon et S. Choi, A NOTE ON LEAD TIME AND DISTRIBUTIONAL ASSUMPTIONS IN CONTINUOUS-REVIEW INVENTORY MODELS, Computers & operations research, 25(11), 1998, pp. 1007-1012
Citation: M. Oh et I. Moon, FRAMEWORK OF DYNAMIC SIMULATION FOR COMPLEX CHEMICAL PROCESSES, The Korean journal of chemical engineering, 15(3), 1998, pp. 231-242
Citation: B. Chang et al., RIGOROUS INDUSTRIAL DYNAMIC SIMULATION OF A CRUDE DISTILLATION UNIT CONSIDERED VALVE TRAY RATING PARAMETERS, Computers & chemical engineering, 22, 1998, pp. 863-866
Citation: I. Moon et Sj. Choi, DISTRIBUTION-FREE PROCEDURES FOR MAKE-TO-ORDER (MTO), MAKE-IN-ADVANCE(MIA), AND COMPOSITE POLICIES, International journal of production economics, 48(1), 1997, pp. 21-28
Citation: Phb. Boltonmaggs et I. Moon, THE MANAGEMENT OF ACUTE CHILDHOOD IDIOPATHIC THROMBOCYTOPENIC PURPURA(ITP) - ASSESSMENT OF UK PRACTICE AGAINST PUBLISHED GUIDELINES, Thrombosis and haemostasis, 1997, pp. 1122-1122
Citation: Jy. Chang et al., FORMATION OF LAMELLAR STRUCTURE IN GAMMA-TITANIUM ALUMINIDE, Journal of materials science letters, 16(12), 1997, pp. 1033-1036
Citation: Phb. Boltonmaggs et I. Moon, ASSESSMENT OF UK PRACTICE FOR MANAGEMENT OF ACUTE CHILDHOOD IDIOPATHIC THROMBOCYTOPENIC PURPURA AGAINST PUBLISHED GUIDELINES, Lancet, 350(9078), 1997, pp. 620-623
Citation: D. Ko et I. Moon, RESCHEDULING ALGORITHMS IN CASE OF UNIT FAILURE FOR BATCH PROCESS MANAGEMENT, Computers & chemical engineering, 21, 1997, pp. 1067-1072
Citation: St. Probst et al., VERIFICATION OF A LOGICALLY CONTROLLED, SOLIDS TRANSPORT-SYSTEM USINGSYMBOLIC MODEL CHECKING, Computers & chemical engineering, 21(4), 1997, pp. 417-429
Citation: I. Moon et al., A SYMBOLIC MODEL VERIFIER FOR SAFE CHEMICAL PROCESS SEQUENTIAL CONTROL-SYSTEMS, Journal of Chemical Engineering of Japan, 30(1), 1997, pp. 13-22
Citation: Jb. Park et al., THE MOLECULAR VARIANTS OF ANGIOTENSINOGEN GENE AND ANGIOTENSIN-CONVERTING ENZYME GENE IN PREECLAMPSIA, Circulation, 96(8), 1997, pp. 555-555
Citation: Kk. Cho et al., SYSTEM-ANALYSIS OF A MULTIPRODUCT, SMALL-LOT-SIZED PRODUCTION BY SIMULATION - A KOREAN MOTOR FACTORY CASE, Computers & industrial engineering, 30(3), 1996, pp. 347-356
Citation: G. Gallego et I. Moon, HOW TO AVOID STOCKOUTS WHEN PRODUCING SEVERAL ITEMS ON A SINGLE FACILITY - WHAT TO DO IF YOU CANT, Computers & operations research, 23(1), 1996, pp. 1-12
Citation: I. Moon et al., CRYOPRESERVATION OF CHYMOMYZA LARVAE (DIPTERA, DROSOPHILIDAE) AT -196-DEGREES-C WITH EXTRACELLULAR FREEZING, Cryo-letters, 17(2), 1996, pp. 105-110
Citation: G. Gallego et I. Moon, STRATEGIC INVESTMENT TO REDUCE SETUP TIMES IN THE ECONOMIC LOT SCHEDULING PROBLEM, Naval research logistics, 42(5), 1995, pp. 773-790
Citation: I. Moon et S. Choi, THE DISTRIBUTION-FREE CONTINUOUS-REVIEW INVENTORY SYSTEM WITH A SERVICE LEVEL CONSTRAINT, Computers & industrial engineering, 27(1-4), 1994, pp. 209-212
Citation: I. Moon et G. Gallego, DISTRIBUTION-FREE PROCEDURES FOR SOME INVENTORY MODELS, The Journal of the Operational Research Society, 45(6), 1994, pp. 651-658
Citation: I. Moon, MULTIPRODUCT ECONOMIC LOT-SIZE MODELS WITH INVESTMENT COSTS FOR SETUPREDUCTION AND QUALITY IMPROVEMENT - REVIEW AND EXTENSIONS, International Journal of Production Research, 32(12), 1994, pp. 2795-2801