AAAAAA

   
Results: 1-14 |
Results: 14

Authors: PATECORNELL ME REGAN PJ
Citation: Me. Patecornell et Pj. Regan, DYNAMIC RISK MANAGEMENT-SYSTEMS - HYBRID ARCHITECTURE AND OFFSHORE PLATFORM ILLUSTRATION, Risk analysis, 18(4), 1998, pp. 485-496

Authors: REGAN PJ PATECORNELL ME
Citation: Pj. Regan et Me. Patecornell, NORMATIVE ENGINEERING RISK MANAGEMENT-SYSTEMS, Reliability engineering & systems safety, 57(2), 1997, pp. 159-169

Authors: PATECORNELL ME LAKATS LM MURPHY DM GABA DM
Citation: Me. Patecornell et al., ANESTHESIA PATIENT RISK - A QUANTITATIVE APPROACH TO ORGANIZATIONAL-FACTORS AND RISK MANAGEMENT OPTIONS, Risk analysis, 17(4), 1997, pp. 511-523

Authors: PATECORNELL ME
Citation: Me. Patecornell, UNCERTAINTIES IN RISK ANALYSIS - 6 LEVELS OF TREATMENT, Reliability engineering & systems safety, 54(2-3), 1996, pp. 95-111

Authors: PATECORNELL ME MURPHY DM
Citation: Me. Patecornell et Dm. Murphy, HUMAN AND MANAGEMENT FACTORS IN PROBABILISTIC RISK ANALYSIS - THE SAMAPPROACH AND OBSERVATIONS FROM RECENT APPLICATIONS, Reliability engineering & systems safety, 53(2), 1996, pp. 115-126

Authors: PATECORNELL ME
Citation: Me. Patecornell, GLOBAL RISK MANAGEMENT, Journal of risk and uncertainty, 12(2-3), 1996, pp. 239-255

Authors: MURPHY DM PATECORNELL ME
Citation: Dm. Murphy et Me. Patecornell, THE SAM FRAMEWORK - MODELING THE EFFECTS OF MANAGEMENT FACTORS ON HUMAN-BEHAVIOR IN RISK ANALYSIS, Risk analysis, 16(4), 1996, pp. 501-515

Authors: PATECORNELL ME FISCHBECK PS
Citation: Me. Patecornell et Ps. Fischbeck, PROBABILISTIC-INTERPRETATION OF COMMAND AND CONTROL SIGNALS - BAYESIAN UPDATING OF THE PROBABILITY OF NUCLEAR ATTACK - A REPLY (VOL 47, PG 237, 1995), Reliability engineering & systems safety, 48(2), 1995, pp. 159-161

Authors: PATECORNELL ME FISCHBECK PS
Citation: Me. Patecornell et Ps. Fischbeck, PROBABILISTIC-INTERPRETATION OF COMMAND AND CONTROL SIGNALS - BAYESIAN UPDATING OF THE PROBABILITY OF NUCLEAR ATTACK - A REPLY, Reliability engineering & systems safety, 47(3), 1995, pp. 237-238

Authors: PATECORNELL ME FISCHBECK PS
Citation: Me. Patecornell et Ps. Fischbeck, PROBABILISTIC-INTERPRETATION OF COMMAND AND CONTROL SIGNALS - BAYESIAN UPDATING OF THE PROBABILITY OF NUCLEAR ATTACK, Reliability engineering & systems safety, 47(1), 1995, pp. 27-36

Authors: PATECORNELL ME
Citation: Me. Patecornell, QUANTITATIVE SAFETY GOALS FOR RISK MANAGEMENT OF INDUSTRIAL FACILITIES, Structural safety, 13(3), 1994, pp. 145-157

Authors: PATECORNELL ME FISCHBECK PS
Citation: Me. Patecornell et Ps. Fischbeck, RISK MANAGEMENT FOR THE TILES OF THE SPACE-SHUTTLE, Interfaces, 24(1), 1994, pp. 64-86

Authors: DAVIS DB PATECORNELL ME
Citation: Db. Davis et Me. Patecornell, A CHALLENGE TO THE COMPOUND LOTTERY AXIOM - A 2-STAGE NORMATIVE STRUCTURE AND COMPARISON TO OTHER THEORIES, Theory and decision, 37(3), 1994, pp. 267-309

Authors: PATECORNELL ME
Citation: Me. Patecornell, LEARNING FROM THE PIPER ALPHA ACCIDENT - A POSTMORTEM ANALYSIS OF TECHNICAL AND ORGANIZATIONAL-FACTORS, Risk analysis, 13(2), 1993, pp. 215-232
Risultati: 1-14 |