Authors:
CRAUWELS HAJ
HARIRI AMA
POTTS CN
VANWASSENHOVE LN
Citation: Haj. Crauwels et al., BRANCH-AND-BOUND ALGORITHMS FOR SINGLE-MACHINE SCHEDULING WITH BATCH SET-UP TIMES TO MINIMIZE TOTAL WEIGHTED COMPLETION-TIME, Annals of operation research, 83, 1998, pp. 59-76
Citation: B. Chen et al., APPROXIMATION ALGORITHMS FOR 2-MACHINE FLOW-SHOP SCHEDULING WITH BATCH SETUP TIMES, Mathematical programming, 82(1-2), 1998, pp. 255-271
Citation: Ama. Hariri et Cn. Potts, A BRANCH-AND-BOUND ALGORITHM FOR THE 2-STAGE ASSEMBLY SCHEDULING PROBLEM, European journal of operational research, 103(3), 1997, pp. 547-556
Citation: Haj. Crauwels et al., LOCAL SEARCH HEURISTICS FOR SINGLE-MACHINE SCHEDULING WITH BATCHING TO MINIMIZE THE NUMBER OF LATE JOBS, European journal of operational research, 90(2), 1996, pp. 200-213
Citation: Cn. Potts, SCHEDULING IN COMPUTER AND MANUFACTURING SYSTEMS, 2ND EDITION - BLAZEWICZ,J, ECKER,KH, SCHMIDT,G, WEGLARZ,J, The Journal of the Operational Research Society, 47(4), 1996, pp. 592-593
Citation: H. Belouadah et Cn. Potts, SCHEDULING IDENTICAL PARALLEL MACHINES TO MINIMIZE TOTAL WEIGHTED COMPLETION-TIME, Discrete applied mathematics, 48(3), 1994, pp. 201-218
Citation: My. Kovalyov et al., A FULLY POLYNOMIAL-APPROXIMATION SCHEME FOR SCHEDULING A SINGLE-MACHINE TO MINIMIZE TOTAL WEIGHTED LATE WORK, Mathematics of operations research, 19(1), 1994, pp. 86-93
Citation: Ama. Hariri et Cn. Potts, SINGLE-MACHINE SCHEDULING WITH DEADLINES TO MINIMIZE THE WEIGHTED NUMBER OF TARDY JOBS, Management science, 40(12), 1994, pp. 1712-1719
Citation: Cl. Monma et Cn. Potts, ANALYSIS OF HEURISTICS FOR PREEMPTIVE PARALLEL MACHINE SCHEDULING WITH BATCH SETUP TIMES, Operations research, 41(5), 1993, pp. 981-993