AAAAAA

   
Results: 1-25 | 26-26
Results: 1-25/26

Authors: CHEN HX CHU CB PROTH JM
Citation: Hx. Chen et al., AN IMPROVEMENT OF THE LAGRANGEAN RELAXATION APPROACH FOR JOB-SHOP SCHEDULING - A DYNAMIC-PROGRAMMING METHOD, IEEE transactions on robotics and automation, 14(5), 1998, pp. 786-795

Authors: CHEN HX CHU CB PROTH JM
Citation: Hx. Chen et al., CYCLIC SCHEDULING OF A HOIST WITH TIME WINDOW CONSTRAINTS, IEEE transactions on robotics and automation, 14(1), 1998, pp. 144-152

Authors: CHU CB PROTH JM WOLFF P
Citation: Cb. Chu et al., PREDICTIVE MAINTENANCE - THE ONE-UNIT REPLACEMENT MODEL, International journal of production economics, 54(3), 1998, pp. 285-295

Authors: PROTH JM SAUER N
Citation: Jm. Proth et N. Sauer, SCHEDULING OF PIECEWISE-CONSTANT PRODUCT FLOWS - A PETRI-NET APPROACH, European journal of operational research, 106(1), 1998, pp. 45-56

Authors: CHU C PROTH JM WANG C
Citation: C. Chu et al., IMPROVING JOB-SHOP SCHEDULES THROUGH CRITICAL PAIRWISE EXCHANGES, International Journal of Production Research, 36(3), 1998, pp. 683-694

Authors: PROTH JM WANG LM XIE XL
Citation: Jm. Proth et al., A CLASS OF PETRI NETS FOR MANUFACTURING SYSTEM INTEGRATION, IEEE transactions on robotics and automation, 13(3), 1997, pp. 317-326

Authors: PROTH JM
Citation: Jm. Proth, MANUFACTURING AND LOGISTICS .1. TOWARDS GLOBAL FRAMEWORKS, Journal of intelligent manufacturing, 8(5), 1997, pp. 333-334

Authors: PROTH JM MAUROY G WARDI Y CHU C XIE XL
Citation: Jm. Proth et al., SUPPLY MANAGEMENT FOR COST MINIMIZATION IN ASSEMBLY SYSTEMS WITH RANDOM COMPONENT YIELD TIMES, Journal of intelligent manufacturing, 8(5), 1997, pp. 385-403

Authors: CHAUVET F HAFEZ N PROTH JM SAUER N
Citation: F. Chauvet et al., MANAGEMENT OF A POOL OF SELF-SERVICE CARS, Journal of intelligent manufacturing, 8(5), 1997, pp. 459-465

Authors: CHEN HX CHU CB PROTH JM
Citation: Hx. Chen et al., SEQUENCING OF PARTS IN ROBOTIC CELLS, International journal of flexible manufacturing systems, 9(1), 1997, pp. 81-103

Authors: WANG CG CHU CB PROTH JM
Citation: Cg. Wang et al., HEURISTIC APPROACHES FOR N M/F/SIGMA-C-I, SCHEDULING PROBLEMS/, European journal of operational research, 96(3), 1997, pp. 636-644

Authors: HERRMANN J PROTH JM SAUER N
Citation: J. Herrmann et al., HEURISTICS FOR UNRELATED MACHINE SCHEDULING WITH PRECEDENCE CONSTRAINTS, European journal of operational research, 102(3), 1997, pp. 528-537

Authors: PROTH JM SAUER N XIE XL
Citation: Jm. Proth et al., OPTIMIZATION OF THE NUMBER OF TRANSPORTATION DEVICES IN A FLEXIBLE MANUFACTURING SYSTEM USING EVENT GRAPHS, IEEE transactions on industrial electronics, 44(3), 1997, pp. 298-306

Authors: CHU C PROTH JM
Citation: C. Chu et Jm. Proth, SINGLE-MACHINE SCHEDULING WITH CHAIN STRUCTURED PRECEDENCE CONSTRAINTS AND SEPARATION TIME WINDOWS, IEEE transactions on robotics and automation, 12(6), 1996, pp. 835-844

Authors: MEHRA A MINIS I PROTH JM
Citation: A. Mehra et al., HIERARCHICAL PRODUCTION PLANNING FOR COMPLEX MANUFACTURING SYSTEMS, Advances in engineering software, 26(3), 1996, pp. 209-218

Authors: WANG CG CHU CB PROTH JM
Citation: Cg. Wang et al., EFFICIENT HEURISTIC AND OPTIMAL APPROACHES FOR N 2/F/SIGMA-C-I SCHEDULING PROBLEMS/, International journal of production economics, 44(3), 1996, pp. 225-237

Authors: PROTH JM SAUER N WARDI Y XIE XL
Citation: Jm. Proth et al., MARKING OPTIMIZATION OF STOCHASTIC TIMED EVENT GRAPHS USING IPA, Discrete event dynamic systems, 6(3), 1996, pp. 221-239

Authors: HERRMANN JW IOANNOU G MINIS I PROTH JM
Citation: Jw. Herrmann et al., A DUAL ASCENT APPROACH TO THE FIXED-CHARGE CAPACITATED NETWORK DESIGNPROBLEM, European journal of operational research, 95(3), 1996, pp. 476-490

Authors: PROTH JM MINIS I
Citation: Jm. Proth et I. Minis, PRODUCTION MANAGEMENT IN A PETRI-NET ENVIRONMENT, RAIRO. Recherche operationnelle, 29(3), 1995, pp. 321-352

Authors: CHU CB PROTH JM SETHI S
Citation: Cb. Chu et al., HEURISTIC PROCEDURES FOR MINIMIZING MAKESPAN AND THE NUMBER OF REQUIRED PALLETS, European journal of operational research, 86(3), 1995, pp. 491-502

Authors: HERRMANN JW IOANNOU G MINIS I NAGI R PROTH JM
Citation: Jw. Herrmann et al., DESIGN OF MATERIAL FLOW NETWORKS IN MANUFACTURING FACILITIES, Journal of manufacturing systems, 14(4), 1995, pp. 277-289

Authors: PROTH JM SAUER N
Citation: Jm. Proth et N. Sauer, CHIP MANUFACTURING - MATCHING PRODUCTION PLAN WITH CUSTOMER REQUIREMENTS, IEEE transactions on components, packaging, and manufacturing technology. Part A, 17(3), 1994, pp. 446-451

Authors: HILLION H PROTH JM
Citation: H. Hillion et Jm. Proth, FINITE-CAPACITY FLOW-CONTROL IN A MULTISTAGE MULTIPRODUCT ENVIRONMENT, International Journal of Production Research, 32(5), 1994, pp. 1119-1136

Authors: PROTH JM XIE XL
Citation: Jm. Proth et Xl. Xie, CYCLE TIME OF STOCHASTIC EVENT GRAPHS - EVALUATION AND MARKING OPTIMIZATION, IEEE transactions on automatic control, 39(7), 1994, pp. 1482-1486

Authors: HAMANN T PROTH JM
Citation: T. Hamann et Jm. Proth, INVENTORY CONTROL OF REPAIRABLE TOOLS WITH INCOMPLETE INFORMATION, International journal of production economics, 30-1, 1993, pp. 543-550
Risultati: 1-25 | 26-26