AAAAAA

   
Results: 1-7 |
Results: 7

Authors: Miller, PF Peters, BA Hort, CA
Citation: Pf. Miller et al., A field study to evaluate integrated flea control using Lufenuron and Nitenpyram compared to Imidacloprid used alone (vol 31, pg 60, 2001), AUST VET PR, 31(3), 2001, pp. 134-134

Authors: Miller, PF Peters, BA Hort, CA
Citation: Pf. Miller et al., A field study to evaluate integrated flea control using lufenuron and nitenpyram compared to imidacloprid used alone, AUST VET PR, 31(2), 2001, pp. 60

Authors: Peters, BA McGinnis, LF
Citation: Ba. Peters et Lf. Mcginnis, Modeling and analysis of the product assignment problem in single stage electronic assembly systems, IIE TRANS, 32(1), 2000, pp. 21-31

Authors: Rajasekharan, M Peters, BA
Citation: M. Rajasekharan et Ba. Peters, Strategic configuration of flexible electronics assembly facilities facingstochastic requirements, INT J PROD, 38(3), 2000, pp. 639-656

Authors: Peters, BA McGinnis, LF
Citation: Ba. Peters et Lf. Mcginnis, Strategic configuration of flexible assembly systems: a single period approximation, IIE TRANS, 31(4), 1999, pp. 379-390

Authors: Yang, TH Rajasekharan, M Peters, BA
Citation: Th. Yang et al., Semiconductor fabrication facility design using a hybrid search methodology, COM IND ENG, 36(3), 1999, pp. 565-583

Authors: Smith, JS Peters, BA Srinivasan, A
Citation: Js. Smith et al., Job shop scheduling considering material handling, INT J PROD, 37(7), 1999, pp. 1541-1560
Risultati: 1-7 |