AAAAAA

   
Results: 1-4 |
Results: 4

Authors: SEVIM H LEI DD
Citation: H. Sevim et Dd. Lei, THE PROBLEM OF PRODUCTION PLANNING IN OPEN-PIT MINES, INFOR. Information systems and operational research, 36(1-2), 1998, pp. 1-12

Authors: SEVIM H LEI DD
Citation: H. Sevim et Dd. Lei, PRODUCTION PLANNING WITH WORKING-SLOPE MAXIMUM-METAL PIT SEQUENCES, Transactions - Institution of Mining and Metallurgy. Section A. Mining industry, 105, 1996, pp. 93-98

Authors: SEVIM H LEI DD
Citation: H. Sevim et Dd. Lei, PRODUCTION PLANNING WITH WORKING-SLOPE MAXIMUM-METAL PIT SEQUENCES (VOL 105, PG A93, 1996), Transactions - Institution of Mining and Metallurgy. Section A. Mining industry, 105, 1996, pp. 180-180

Authors: SEVIM H WANG Q
Citation: H. Sevim et Q. Wang, COMPREHENSIVE BELT CONVEYOR NETWORK DESIGN - A SUPERIOR METHOD TO SIMULATION, Transactions - Institution of Mining and Metallurgy. Section A. Mining industry, 100, 1991, pp. 174-180
Risultati: 1-4 |