Citation: G. Laporte et al., OPTIMAL SEQUENCING RULES FOR SOME LARGE-SCALE FLEXIBLE MANUFACTURING PROBLEMS UNDER THE MANHATTAN AND CHEBYSHEV METRICS, International journal of flexible manufacturing systems, 10(1), 1998, pp. 27-42
Citation: G. Desaulniers et al., A SHORTEST-PATH ALGORITHM FOR A CARLIKE ROBOT IN A POLYGONAL ENVIRONMENT, The International journal of robotics research, 17(5), 1998, pp. 512-530
Authors:
IOACHIM I
GELINAS S
SOUMIS F
DESROSIERS J
Citation: I. Ioachim et al., A DYNAMIC-PROGRAMMING ALGORITHM FOR THE SHORTEST-PATH PROBLEM WITH TIME WINDOWS AND LINEAR NODE COSTS, Networks, 31(3), 1998, pp. 193-204
Citation: S. Martello et al., EXACT AND APPROXIMATION ALGORITHMS FOR MAKESPAN MINIMIZATION ON UNRELATED PARALLEL MACHINES, Discrete applied mathematics, 75(2), 1997, pp. 169-188
Authors:
ZIARATI K
SOUMIS F
DESROSIERS J
GELINAS S
SAINTONGE A
Citation: K. Ziarati et al., LOCOMOTIVE ASSIGNMENT WITH HETEROGENEOUS CONSISTS AT CN NORTH-AMERICA, European journal of operational research, 97(2), 1997, pp. 281-292
Citation: S. Damours et al., PRICE-BASED PLANNING AND SCHEDULING OF MULTIPRODUCT ORDERS IN SYMBIOTIC MANUFACTURING NETWORKS, European journal of operational research, 96(1), 1997, pp. 148-166
Citation: G. Desaulniers et F. Soumis, AN EFFICIENT ALGORITHM TO FIND A SHORTEST-PATH FOR - A CAR-LIKE ROBOT, IEEE transactions on robotics and automation, 11(6), 1995, pp. 819-828
Citation: I. Ioachim et F. Soumis, SCHEDULE EFFICIENCY IN A ROBOTIC PRODUCTION CELL, International journal of flexible manufacturing systems, 7(1), 1995, pp. 5-26
Authors:
LAURENT JC
DESAULNIERS G
MALHAME RP
SOUMIS F
Citation: Jc. Laurent et al., A COLUMN GENERATION METHOD FOR OPTIMAL LOAD MANAGEMENT VIA CONTROL OFELECTRIC WATER-HEATERS, IEEE transactions on power systems, 10(3), 1995, pp. 1389-1400
Authors:
BOURJOLLY JM
GABOUNE B
LAPORTE G
SOUMIS F
Citation: Jm. Bourjolly et al., OPTIMAL POLICIES FOR SOME DISCRETE SEQUENCING PROBLEMS ARISING IN FLEXIBLE MANUFACTURING, Computers & industrial engineering, 28(2), 1995, pp. 301-307
Citation: Cc. Ribeiro et F. Soumis, A COLUMN GENERATION APPROACH TO THE MULTIPLE-DEPOT VEHICLE SCHEDULINGPROBLEM, Operations research, 42(1), 1994, pp. 41-52
Citation: B. Gaboune et al., EXPECTED DISTANCES BETWEEN 2 UNIFORMLY DISTRIBUTED RANDOM POINTS IN RECTANGLES AND RECTANGULAR PARALLELEPIPEDS, The Journal of the Operational Research Society, 44(5), 1993, pp. 513-519
Authors:
LANGEVIN A
DESROCHERS M
DESROSIERS J
GELINAS S
SOUMIS F
Citation: A. Langevin et al., A 2-COMMODITY FLOW FORMULATION FOR THE TRAVELING SALESMAN AND THE MAKESPAN PROBLEMS WITH TIME WINDOWS, Networks, 23(7), 1993, pp. 631-640