AAAAAA

   
Results: 1-24 |
Results: 24

Authors: MEHTA SV UZSOY R
Citation: Sv. Mehta et R. Uzsoy, MINIMIZING TOTAL TARDINESS ON A BATCH PROCESSING MACHINE WITH INCOMPATIBLE JOB FAMILIES, IIE transactions, 30(2), 1998, pp. 165-178

Authors: KEMPF KG UZSOY R WANG CS
Citation: Kg. Kempf et al., SCHEDULING A SINGLE BATCH PROCESSING MACHINE WITH SECONDARY RESOURCE CONSTRAINTS, Journal of manufacturing systems, 17(1), 1998, pp. 37-51

Authors: AVRAMIDIS AN HEALY KJ UZSOY R
Citation: An. Avramidis et al., CONTROL OF A BATCH-PROCESSING MACHINE - A COMPUTATIONAL APPROACH, International journal of production research (Print), 36(11), 1998, pp. 3167-3181

Authors: DEMIRKOL E UZSOY R
Citation: E. Demirkol et R. Uzsoy, PERFORMANCE OF DECOMPOSITION METHODS FOR COMPLEX WORKSHOPS UNDER MULTIPLE CRITERIA, Computers & industrial engineering, 33(1-2), 1997, pp. 261-264

Authors: GEIGER CD KEMPF KG UZSOY R
Citation: Cd. Geiger et al., A TABU SEARCH APPROACH TO SCHEDULING AN AUTOMATED WET ETCH STATION, Journal of manufacturing systems, 16(2), 1997, pp. 102-116

Authors: LEE CY UZSOY R MARTINVEGA LA
Citation: Cy. Lee et al., EFFICIENT ALGORITHMS FOR SCHEDULING SEMICONDUCTOR BURN-IN OPERATIONS (VOL 40, PG 764, 1992), Operations research, 45(1), 1997, pp. 153-154

Authors: OVACIK IM UZSOY R
Citation: Im. Ovacik et R. Uzsoy, DECOMPOSITION METHODS FOR SCHEDULING SEMICONDUCTOR TESTING FACILITIES, International journal of flexible manufacturing systems, 8(4), 1996, pp. 357-387

Authors: CHAND S TRAUB R UZSOY R
Citation: S. Chand et al., SINGLE-MACHINE SCHEDULING WITH DYNAMIC ARRIVALS - DECOMPOSITION RESULTS AND AN IMPROVED ALGORITHM, Naval research logistics, 43(5), 1996, pp. 709-719

Authors: CHAND S TRAUB R UZSOY R
Citation: S. Chand et al., AN ITERATIVE HEURISTIC FOR THE SINGLE-MACHINE DYNAMIC TOTAL COMPLETION-TIME SCHEDULING PROBLEM, Computers & operations research, 23(7), 1996, pp. 641-651

Authors: HOLTSCLAW HH UZSOY R
Citation: Hh. Holtsclaw et R. Uzsoy, MACHINE CRITICALITY MEASURES AND SUBPROBLEM SOLUTION PROCEDURES IN SHIFTING BOTTLENECK METHODS - A COMPUTATIONAL STUDY, The Journal of the Operational Research Society, 47(5), 1996, pp. 666-677

Authors: UZSOY R
Citation: R. Uzsoy, SCHEDULING BATCH PROCESSING MACHINES WITH INCOMPATIBLE JOB FAMILIES (VOL 33, PG 2685, 1995), International Journal of Production Research, 34(5), 1996, pp. 1471-1471

Authors: ASHBY JR UZSOY R
Citation: Jr. Ashby et R. Uzsoy, SCHEDULING AND ORDER RELEASE IN A SINGLE-STAGE PRODUCTION SYSTEM, Journal of manufacturing systems, 14(4), 1995, pp. 290-306

Authors: OVACIK IM UZSOY R
Citation: Im. Ovacik et R. Uzsoy, ROLLING HORIZON PROCEDURES FOR DYNAMIC PARALLEL MACHINE SCHEDULING WITH SEQUENCE-DEPENDENT SETUP TIMES, International Journal of Production Research, 33(11), 1995, pp. 3173-3192

Authors: UZSOY R
Citation: R. Uzsoy, SCHEDULING BATCH PROCESSING MACHINES WITH INCOMPATIBLE JOB FAMILIES, International Journal of Production Research, 33(10), 1995, pp. 2685-2708

Authors: UZSOY R LEE CY MARTINVEGA LA
Citation: R. Uzsoy et al., A REVIEW OF PRODUCTION PLANNING AND SCHEDULING MODELS IN THE SEMICONDUCTOR INDUSTRY .2. SHOP-FLOOR CONTROL, IIE transactions, 26(5), 1994, pp. 44-55

Authors: ULUSOY G UZSOY R
Citation: G. Ulusoy et R. Uzsoy, A ROBUST STRATEGY APPROACH TO A STRATEGIC MOBILITY PROBLEM, European journal of operational research, 79(2), 1994, pp. 266-276

Authors: OVACIK IM UZSOY R
Citation: Im. Ovacik et R. Uzsoy, EXPLOITING SHOP-FLOOR STATUS INFORMATION TO SCHEDULE COMPLEX JOB SHOPS, Journal of manufacturing systems, 13(2), 1994, pp. 73-84

Authors: UZSOY R
Citation: R. Uzsoy, SCHEDULING A SINGLE BATCH PROCESSING MACHINE WITH NONIDENTICAL JOB SIZES, International Journal of Production Research, 32(7), 1994, pp. 1615-1635

Authors: OVACIK IM UZSOY R
Citation: Im. Ovacik et R. Uzsoy, ROLLING HORIZON ALGORITHMS FOR A SINGLE-MACHINE DYNAMIC SCHEDULING PROBLEM WITH SEQUENCE-DEPENDENT SETUP TIMES, International Journal of Production Research, 32(6), 1994, pp. 1243-1263

Authors: LEE CY LIN CS UZSOY R WONG CC
Citation: Cy. Lee et al., IMPLEMENTATION OF A DEMAND-PULL SYSTEM IN A JOB-SHOP ENVIRONMENT, International Journal of Production Research, 32(12), 1994, pp. 2915-2927

Authors: OVACIK IM UZSOY R
Citation: Im. Ovacik et R. Uzsoy, WORST-CASE ERROR-BOUNDS FOR PARALLEL MACHINE SCHEDULING PROBLEMS WITHBOUNDED SEQUENCE-DEPENDENT SETUP TIMES, Operations research letters, 14(5), 1993, pp. 251-256

Authors: CHANDRU V LEE CY UZSOY R
Citation: V. Chandru et al., MINIMIZING TOTAL COMPLETION-TIME ON A BATCH PROCESSING MACHINE WITH JOB FAMILIES, Operations research letters, 13(2), 1993, pp. 61-65

Authors: CHANDRU V LEE CY UZSOY R
Citation: V. Chandru et al., MINIMIZING TOTAL COMPLETION-TIME ON BATCH PROCESSING MACHINES, International Journal of Production Research, 31(9), 1993, pp. 2097-2121

Authors: UZSOY R MARTINVEGA LA LEE CY LEONARD PA
Citation: R. Uzsoy et al., PRODUCTION SCHEDULING ALGORITHMS FOR A SEMICONDUCTOR TEST FACILITY, IEEE transactions on semiconductor manufacturing, 4(4), 1991, pp. 270-280
Risultati: 1-24 |