AAAAAA

   
Results: 1-6 |
Results: 6

Authors: VO TV BLACKBURN TR CASAZZA LO HEASLER PG MARA NL PHAN HK
Citation: Tv. Vo et al., RELIABILITY-ANALYSIS IN SUPPORT OF RISK ASSESSMENT FOR HYDROELECTRIC GENERATING STATIONS, Journal of water resources planning and management, 123(3), 1997, pp. 179-188

Authors: VO TV MITTS TM BLACKBURN TR PHAN HK
Citation: Tv. Vo et al., RISK ASSESSMENT FOR SPENT-FUEL POOL COOLING AT BOILING WATER-REACTORS, Nuclear technology, 114(2), 1996, pp. 179-193

Authors: DALING PM MARLER JE VO TV PHAN HK FRILEY JR
Citation: Pm. Daling et al., ASSESSMENT OF COSTS AND BENEFITS ASSOCIATED WITH RESOLUTION OF GENERIC SAFETY ISSUE 143 - AVAILABILITY OF HEATING, VENTILATION, AND AIR-CONDITIONING AND CHILLED WATER-SYSTEMS, Nuclear technology, 109(3), 1995, pp. 429-436

Authors: VO TV EDWARDS DR
Citation: Tv. Vo et Dr. Edwards, DEVELOPMENT OF IN-SERVICE INSPECTION PRIORITIES FOR PRESSURIZED-WATERREACTOR HIGH-PRESSURE INJECTION SYSTEM COMPONENTS, Nuclear technology, 106(1), 1994, pp. 110-124

Authors: VO TV GORE BF SIMONEN FA DOCTOR SR
Citation: Tv. Vo et al., RISK ASSESSMENT IN SETTING INSERVICE INSPECTION PRIORITIES AT LIGHT-WATER REACTORS, Nuclear Engineering and Design, 142(2-3), 1993, pp. 239-253

Authors: VO TV SIMONEN FA DOCTOR SR SMITH BW GORE BF
Citation: Tv. Vo et al., DEVELOPMENT OF IN-SERVICE INSPECTION PLANS FOR NUCLEAR-COMPONENTS AT THE SURRY UNIT-1 NUCLEAR-POWER STATION, Nuclear technology, 102(3), 1993, pp. 403-415
Risultati: 1-6 |