COST-BENEFIT-ANALYSIS OF A 2-UNIT STANDBY SYSTEM WITH A PROVISO OF REPAIR-MACHINE FAILURE

Citation
R. Gupta et al., COST-BENEFIT-ANALYSIS OF A 2-UNIT STANDBY SYSTEM WITH A PROVISO OF REPAIR-MACHINE FAILURE, Microelectronics and reliability, 34(8), 1994, pp. 1391-1394
Citations number
3
Categorie Soggetti
Engineering, Eletrical & Electronic
ISSN journal
00262714
Volume
34
Issue
8
Year of publication
1994
Pages
1391 - 1394
Database
ISI
SICI code
0026-2714(1994)34:8<1391:COA2SS>2.0.ZU;2-K
Abstract
This paper deals with the cost analysis of a two-unit (priority and or dinary) cold standby system model under a very practicable assumption that the repair machine (R.M.) may also fail during the repair of a fa iled unit. Some important measures of system effectiveness are obtaine d by using the regenerative point technique (R.P.T.).