R. Gupta et al., COST-BENEFIT-ANALYSIS OF A 2-UNIT STANDBY SYSTEM WITH A PROVISO OF REPAIR-MACHINE FAILURE, Microelectronics and reliability, 34(8), 1994, pp. 1391-1394
This paper deals with the cost analysis of a two-unit (priority and or
dinary) cold standby system model under a very practicable assumption
that the repair machine (R.M.) may also fail during the repair of a fa
iled unit. Some important measures of system effectiveness are obtaine
d by using the regenerative point technique (R.P.T.).