Authors:
VALE ZA
FERNANDES MF
ROSADO C
MARQUES A
RAMOS C
FARIA L
Citation: Za. Vale et al., BETTER KBS FOR REAL-TIME APPLICATIONS IN POWER-SYSTEM CONTROL CENTERS- THE EXPERIENCE OF SPARSE PROJECT, Computers in industry, 37(2), 1998, pp. 97-111
Citation: P. Burrell et D. Inman, AN EXPERT-SYSTEM FOR THE ANALYSIS OF FAULTS IN AN ELECTRICITY SUPPLY NETWORK - PROBLEMS AND ACHIEVEMENTS, Computers in industry, 37(2), 1998, pp. 113-123
Citation: S. Myint et Mt. Tabucanon, THE FRAMEWORK FOR AN EXPERT-SYSTEM TO GENERATE ALTERNATIVE PRODUCTS IN CONCURRENT ENGINEERING DESIGN, Computers in industry, 37(2), 1998, pp. 125-134
Citation: A. Lekova et D. Batanov, SELF-TESTING AND SELF-LEARNING FUZZY EXPERT-SYSTEM FOR TECHNOLOGICAL PROCESS-CONTROL, Computers in industry, 37(2), 1998, pp. 135-141
Citation: M. Rao et al., INTEGRATED DISTRIBUTED INTELLIGENT SYSTEM ARCHITECTURE FOR INCIDENTS MONITORING AND DIAGNOSIS, Computers in industry, 37(2), 1998, pp. 143-151
Citation: C. Frasson et E. Aimeur, DESIGNING A MULTI-STRATEGIC INTELLIGENT TUTORING SYSTEM FOR TRAINING IN INDUSTRY, Computers in industry, 37(2), 1998, pp. 153-167
Citation: Rj. Kuo et Kc. Xue, AN INTELLIGENT SALES FORECASTING SYSTEM THROUGH INTEGRATION OF ARTIFICIAL NEURAL-NETWORK AND FUZZY NEURAL-NETWORK, Computers in industry, 37(1), 1998, pp. 1-15
Citation: K. Tang et al., OPTIMAL WORKPIECE SETUPS FOR 4-AXIS NUMERICAL CONTROL MACHINING BASEDON MACHINABILITY, Computers in industry, 37(1), 1998, pp. 27-41
Citation: U. Roy et Jm. Liao, APPLICATION OF A BLACKBOARD FRAMEWORK TO A COOPERATIVE FIXTURE DESIGNSYSTEM, Computers in industry, 37(1), 1998, pp. 67-81
Citation: Sp. Mavromatisl et Ac. Kokossis, A LOGIC-BASED MODEL FOR THE ANALYSIS AND OPTIMIZATION OF STEAM-TURBINE NETWORKS, Computers in industry, 36(3), 1998, pp. 165-179
Citation: B. Csukas et S. Balogh, COMBINING GENETIC PROGRAMMING WITH GENERIC SIMULATION-MODELS IN EVOLUTIONARY SYNTHESIS, Computers in industry, 36(3), 1998, pp. 181-197
Citation: P. Loos et T. Allweyer, APPLICATION OF PRODUCTION PLANNING AND SCHEDULING IN THE PROCESS INDUSTRIES, Computers in industry, 36(3), 1998, pp. 199-208
Citation: A. Artiba et F. Riane, AN APPLICATION OF A PLANNING AND SCHEDULING MULTIMODEL APPROACH IN THE CHEMICAL-INDUSTRY, Computers in industry, 36(3), 1998, pp. 209-229
Citation: A. Gascon et al., COMPUTER-ASSISTED MULTIITEM, MULTIMACHINE AND MULTISITE SCHEDULING INA HARDWOOD FLOORING FACTORY, Computers in industry, 36(3), 1998, pp. 231-244
Citation: F. Blomer et Ho. Gunther, SCHEDULING OF A MULTIPRODUCT BATCH PROCESS IN THE CHEMICAL-INDUSTRY, Computers in industry, 36(3), 1998, pp. 245-259
Citation: O. Hammerschmidt et H. Vogelsang, DESIGN OF DISTRIBUTED REAL-TIME SYSTEMS IN-PROCESS CONTROL APPLICATIONS, Computers in industry, 36(3), 1998, pp. 261-270
Citation: Z. Verwaterlukszo, A PRACTICAL APPROACH TO RECIPE IMPROVEMENT AND OPTIMIZATION IN THE BATCH PROCESSING-INDUSTRY, Computers in industry, 36(3), 1998, pp. 279-300