Citation: Tf. Hassett et Dl. Dietrich, AVAILABILITY RELIABILITY ENGINEERING ANALYSIS OF 3-STAGE, 4-STAGE, AND 5-STAGE UNRELIABLE SERIES TRANSFER LINES, Journal of manufacturing systems, 14(6), 1995, pp. 427-438
Citation: Cs. Park et Gt. Kim, AN ECONOMIC-EVALUATION MODEL FOR ADVANCED MANUFACTURING SYSTEMS USINGACTIVITY-BASED COSTING, Journal of manufacturing systems, 14(6), 1995, pp. 439-451
Citation: D. Yiphoi et D. Dutta, DATA EXTRACTION FROM GEOMETRIC-MODELS FOR PROCESS PLANNING FOR PARALLEL MACHINES, Journal of manufacturing systems, 14(5), 1995, pp. 307-318
Citation: Ll. Chen et al., PARTIAL VISIBILITY FOR SELECTING A PARTING DIRECTION IN MOLD AND DIE DESIGN, Journal of manufacturing systems, 14(5), 1995, pp. 319-330
Authors:
FAROUKI RT
KOENIG T
TARABANIS KA
KOREIN JU
BATCHELDER JS
Citation: Rt. Farouki et al., PATH PLANNING WITH OFFSET CURVES FOR LAYERED FABRICATION PROCESSES (REPRINTED FROM PED, VOL 68-2, MANUFACTURING SCIENCE AND ENGINEERING), Journal of manufacturing systems, 14(5), 1995, pp. 355-368
Citation: Ys. Wong et Zy. Wang, AUTOMATED PROCESS PLANNING FOR CNC MACHINING OF SPHERICAL SPACE-FRAMENODES, Journal of manufacturing systems, 14(5), 1995, pp. 369-377
Citation: Iy. Tumer et al., INVESTIGATION OF CHARACTERISTIC MEASURES FOR THE ANALYSIS AND SYNTHESIS OF PRECISION-MACHINED SURFACES, Journal of manufacturing systems, 14(5), 1995, pp. 378-392
Citation: M. Khouja et De. Booth, FUZZY CLUSTERING PROCEDURE FOR EVALUATION AND SELECTION OF INDUSTRIALROBOTS, Journal of manufacturing systems, 14(4), 1995, pp. 244-251
Citation: Hb. Cho et Ra. Wysk, INTELLIGENT WORKSTATION CONTROLLER FOR COMPUTER-INTEGRATED MANUFACTURING - PROBLEMS AND MODELS, Journal of manufacturing systems, 14(4), 1995, pp. 252-263
Citation: Bw. Cheng et S. Maghsoodloo, OPTIMIZATION OF MECHANICAL ASSEMBLY TOLERANCES BY INCORPORATING TAGUCHIS QUALITY LOSS FUNCTION, Journal of manufacturing systems, 14(4), 1995, pp. 264-276
Authors:
HERRMANN JW
IOANNOU G
MINIS I
NAGI R
PROTH JM
Citation: Jw. Herrmann et al., DESIGN OF MATERIAL FLOW NETWORKS IN MANUFACTURING FACILITIES, Journal of manufacturing systems, 14(4), 1995, pp. 277-289
Citation: Jr. Ashby et R. Uzsoy, SCHEDULING AND ORDER RELEASE IN A SINGLE-STAGE PRODUCTION SYSTEM, Journal of manufacturing systems, 14(4), 1995, pp. 290-306
Citation: Ff. Chen et Q. Su, SCHEDULING SINGLE-GRIPPER GANTRY ROBOTS IN TIGHTLY COUPLED SERIAL PRODUCTION LINES - OPTIMUM VS PUSH PULL CONCEPT BASED SEQUENCES/, Journal of manufacturing systems, 14(3), 1995, pp. 139-147
Citation: L. Burke et S. Kamal, NEURAL NETWORKS AND THE PART FAMILY MACHINE GROUP FORMATION PROBLEM IN CELLULAR MANUFACTURING - A FRAMEWORK USING FUZZY ART, Journal of manufacturing systems, 14(3), 1995, pp. 148-159
Citation: Cy. Song et al., HEURISTIC ALGORITHM FOR THE TOOL MOVEMENT POLICY IN FLEXIBLE MANUFACTURING SYSTEMS, Journal of manufacturing systems, 14(3), 1995, pp. 160-168
Citation: L. Galbraith et Tj. Greene, MANUFACTURING SYSTEM PERFORMANCE SENSITIVITY TO SELECTION OF PRODUCT DESIGN METRICS, Journal of manufacturing systems, 14(2), 1995, pp. 71-79