Citation: Gjc. Gaalman et al., Towards an integration of process planning and production planning and control for flexible manufacturing systems, INT J FLEX, 11(1), 1999, pp. 5-17
Citation: Dg. Zhang et Hc. Zhang, A simulation study of an object-oriented integration testbed for process planning and production scheduling, INT J FLEX, 11(1), 1999, pp. 19-35
Authors:
McDonnell, P
Smith, G
Joshi, S
Kumara, SRT
Citation: P. Mcdonnell et al., A cascading auction protocol as a framework for integrating process planning and heterarchical shop floor control, INT J FLEX, 11(1), 1999, pp. 37-62
Citation: K. Pflughoeft et Gk. Hutchinson, The effects of workstation flexibility on the (N x N) job shop problem, INT J FLEX, 11(1), 1999, pp. 103-113
Citation: Dw. Apley et al., DIAGNOSTICS IN DISASSEMBLY UNSCREWING OPERATIONS, International journal of flexible manufacturing systems, 10(2), 1998, pp. 111-128
Citation: V. Kats et E. Levner, CYCLIC SCHEDULING OF OPERATIONS FOR A PART TYPE IN AN FMS HANDLED BY A SINGLE ROBOT - A PARAMETRIC CRITICAL-PATH APPROACH, International journal of flexible manufacturing systems, 10(2), 1998, pp. 129-138
Citation: Md. Jeng et Sc. Chen, A HEURISTIC-SEARCH APPROACH USING APPROXIMATE SOLUTIONS TO PETRI-NET STATE-EQUATIONS FOR SCHEDULING FLEXIBLE MANUFACTURING SYSTEMS, International journal of flexible manufacturing systems, 10(2), 1998, pp. 139-162
Citation: Vp. Kochikar et Tt. Narendran, LOGICAL CELL-FORMATION IN FMS, USING FLEXIBILITY-BASED CRITERIA, International journal of flexible manufacturing systems, 10(2), 1998, pp. 163-181
Citation: Si. Gass et al., FITTING CIRCLES AND SPHERES TO COORDINATE MEASURING MACHINE DATA, International journal of flexible manufacturing systems, 10(1), 1998, pp. 5-25
Citation: G. Laporte et al., OPTIMAL SEQUENCING RULES FOR SOME LARGE-SCALE FLEXIBLE MANUFACTURING PROBLEMS UNDER THE MANHATTAN AND CHEBYSHEV METRICS, International journal of flexible manufacturing systems, 10(1), 1998, pp. 27-42
Citation: Rm. Franza et C. Gaimon, FLEXIBILITY AND PRICING DECISIONS FOR HIGH-VOLUME PRODUCTS WITH SHORTLIFE-CYCLES, International journal of flexible manufacturing systems, 10(1), 1998, pp. 43-71
Citation: M. Lawley et al., THE APPLICATION AND EVALUATION OF BANKERS ALGORITHM FOR DEADLOCK-FREEBUFFER SPACE ALLOCATION IN FLEXIBLE MANUFACTURING SYSTEMS, International journal of flexible manufacturing systems, 10(1), 1998, pp. 73-100
Citation: Cy. Lee et Gl. Vairaktarakis, Performance comparison of some classes of flexible flow shops and job shops, INT J FLEX, 10(4), 1998, pp. 379-405
Citation: Hw. Kang et al., Integrated modeling framework for manufacturing systems: A unified representation of the physical process and information system, INT J FLEX, 10(3), 1998, pp. 231-265
Citation: A. Kumar et al., A DYNAMIC TOOL REQUIREMENT PLANNING-MODEL FOR FLEXIBLE MANUFACTURING SYSTEMS, International journal of flexible manufacturing systems, 9(4), 1997, pp. 307-342