Citation: Jl. Briaud et al., SHOULD GROUTED ANCHORS HAVE SHORT TENDON BOND-LENGTH, Journal geotechnical and geoenvironmental engineering, 124(2), 1998, pp. 110-119
Citation: Jl. Briaud et A. Chaouch, HYDRATE MELTING IN SOIL AROUND HOT CONDUCTOR, Journal geotechnical and geoenvironmental engineering, 123(7), 1997, pp. 645-653
Citation: Jl. Briaud, BITUMEN SELECTION FOR REDUCTION OF DOWNDRAG ON PILES, Journal geotechnical and geoenvironmental engineering, 123(12), 1997, pp. 1127-1134
Citation: Jl. Briaud et Y. Lim, SOIL-NAILED WALL UNDER PILED BRIDGE ABUTMENT - SIMULATION AND GUIDELINES, Journal geotechnical and geoenvironmental engineering, 123(11), 1997, pp. 1043-1050
Citation: At. Yeung et al., FIELD INVESTIGATION OF POTENTIAL CONTAMINATION BY BITUMEN-COATED PILES, Journal of geotechnical engineering, 122(9), 1996, pp. 736-744
Citation: Jl. Briaud et M. Ballouz, LATWAK - IMPACT TEST TO OBTAIN PILE LATERAL STATIC STIFFNESS, Journal of geotechnical engineering, 122(6), 1996, pp. 437-444