AAAAAA

   
Results: 1-9 |
Results: 9

Authors: SMITH RP EPPINGER SD
Citation: Rp. Smith et Sd. Eppinger, DECIDING BETWEEN SEQUENTIAL AND CONCURRENT TASKS IN ENGINEERING DESIGN, Concurrent engineering, research and applications, 6(1), 1998, pp. 15-25

Authors: KRISHNAN V EPPINGER SD WHITNEY DE
Citation: V. Krishnan et al., SIMPLIFYING ITERATIONS IN CROSS-FUNCTIONAL DESIGN DECISION-MAKING, Journal of mechnical design, 119(4), 1997, pp. 485-493

Authors: EPPINGER SD NUKALA MV WHITNEY DE
Citation: Sd. Eppinger et al., GENERALIZED MODELS OF DESIGN ITERATION USING SIGNAL FLOW-GRAPHS, RESEARCH IN ENGINEERING DESIGN-THEORY APPLICATIONS AND CONCURRENT ENGINEERING, 9(2), 1997, pp. 112-123

Authors: SMITH RP EPPINGER SD
Citation: Rp. Smith et Sd. Eppinger, A PREDICTIVE MODEL OF SEQUENTIAL ITERATION IN ENGINEERING DESIGN, Management science, 43(8), 1997, pp. 1104-1120

Authors: KRISHNAN V EPPINGER SD WHITNEY DE
Citation: V. Krishnan et al., A MODEL-BASED FRAMEWORK TO OVERLAP PRODUCT DEVELOPMENT ACTIVITIES, Management science, 43(4), 1997, pp. 437-451

Authors: SMITH RP EPPINGER SD
Citation: Rp. Smith et Sd. Eppinger, IDENTIFYING CONTROLLING FEATURES OF ENGINEERING DESIGN ITERATION, Management science, 43(3), 1997, pp. 276-293

Authors: OCONNOR DN EPPINGER SD SEERING WP WORMLEY DN
Citation: Dn. Oconnor et al., ACTIVE CONTROL OF A HIGH-SPEED PANTOGRAPH, Journal of dynamic systems, measurement, and control, 119(1), 1997, pp. 1-4

Authors: EPPINGER SD HUBER CD PHAM VH
Citation: Sd. Eppinger et al., A METHODOLOGY FOR MANUFACTURING PROCESS SIGNATURE ANALYSIS, Journal of manufacturing systems, 14(1), 1995, pp. 20-34

Authors: MORELLI MD EPPINGER SD GULATI RK
Citation: Md. Morelli et al., PREDICTING TECHNICAL COMMUNICATION IN PRODUCT DEVELOPMENT ORGANIZATIONS, IEEE transactions on engineering management, 42(3), 1995, pp. 215-222
Risultati: 1-9 |