Citation: Xh. Guan et al., AN OPTIMIZATION-BASED ALGORITHM FOR SCHEDULING HYDROTHERMAL POWER-SYSTEMS WITH CASCADED RESERVOIRS AND DISCRETE HYDRO CONSTRAINTS, IEEE transactions on power systems, 12(4), 1997, pp. 1775-1780
Citation: Whe. Liu et Xh. Guan, FUZZY CONSTRAINT ENFORCEMENT AND CONTROL ACTION CURTAILMENT IN AN OPTIMAL POWER-FLOW, IEEE transactions on power systems, 11(2), 1996, pp. 639-644
Citation: Whe. Liu et Xh. Guan, FUZZY CONSTRAINT ENFORCEMENT AND CONTROL ACTION CURTAILMENT IN AN OPTIMAL POWER-FLOW - DISCUSSION, IEEE transactions on power systems, 11(2), 1996, pp. 645-645
Citation: Xh. Guan et Ye. Shi, COLLABORATIVE STUDY ON EVALUATION OF IMMUNODIAGNOSTIC ASSAYS IN SCHISTOSOMIASIS-JAPONICA BY TREATMENT EFFICACY ASSESSMENT, Chinese medical journal, 109(9), 1996, pp. 659-664
Citation: Xh. Guan et al., NONLINEAR APPROXIMATION METHOD IN LAGRANGIAN RELAXATION-BASED ALGORITHMS FOR HYDROTHERMAL SCHEDULING, IEEE transactions on power systems, 10(2), 1995, pp. 772-778
Citation: Xh. Guan et al., OPTIMIZATION-BASED SCHEDULING OF HYDROTHERMAL POWER-SYSTEMS WITH PUMPED-STORAGE UNITS, IEEE transactions on power systems, 9(2), 1994, pp. 1023-1031
Authors:
WANG C
SHAHIDEHPOUR SM
ELHAWARY ME
GUAN XH
LUH PB
RUZIC S
RAJAKOVIC N
Citation: C. Wang et al., EFFECTS OF RAMP-RATE LIMITS ON UNIT COMMITMENT AND ECONOMIC-DISPATCH, IEEE transactions on power systems, 8(3), 1993, pp. 1341-1350