Citation: F. Wilkendorf et al., MINIMIZATION OF THE ANNUAL COST FOR COMPLETE UTILITY SYSTEMS, Chemical engineering research & design, 76(A3), 1998, pp. 239-245
Citation: M. Badell et al., INTEGRATED ON LINE PRODUCTION AND FINANCIAL SCHEDULING WITH INTELLIGENT AUTONOMOUS AGENT BASED INFORMATION-SYSTEM, Computers & chemical engineering, 22, 1998, pp. 271-277
Authors:
GRAELLS M
CANTON J
PESCHAUD B
PUIGJANER L
Citation: M. Graells et al., GENERAL-APPROACH AND TOOL FOR THE SCHEDULING OF COMPLEX PRODUCTION SYSTEMS, Computers & chemical engineering, 22, 1998, pp. 395-402
Citation: A. Mehlhorn et al., USING RATE-BASED APPROACH UNDER CONSIDERATION OF DIFFERENT CONTACTINGREGIMES FOR MULTICOMPONENT BATCH DISTILLATION SIMULATION, Computers & chemical engineering, 22, 1998, pp. 645-648
Citation: E. Sanmarti et al., COMBINATORIAL TECHNIQUE FOR SHORT-TERM SCHEDULING OF MULTIPURPOSE BATCH PLANTS BASED ON SCHEDULE-GRAPH REPRESENTATION, Computers & chemical engineering, 22, 1998, pp. 847-850
Citation: Z. Calderon et al., WASTE ANALYSIS AND MINIMIZATION IN BATCH AND SEMIBATCH REACTOR OPERATION THROUGH DYNAMIC SIMULATION AND NEURAL NETWORKS, Computers & chemical engineering, 22, 1998, pp. 977-980
Citation: L. Puigjaner et A. Espuna, PROSPECTS FOR INTEGRATED MANAGEMENT AND CONTROL OF TOTAL SITES IN THEBATCH MANUFACTURING-INDUSTRY, Computers & chemical engineering, 22(1-2), 1998, pp. 87-107
Authors:
KLEMES J
DHOLE VR
RAISSI K
PERRY SJ
PUIGJANER L
Citation: J. Klemes et al., TARGETING AND DESIGN METHODOLOGY FOR REDUCTION OF FUEL, POWER AND CO2ON TOTAL SITES, Applied thermal engineering, 17(8-10), 1997, pp. 993-1003
Authors:
WILKENDORF F
COROMINAS J
ESPUNA A
PUIGJANER L
Citation: F. Wilkendorf et al., A GENERAL FORMULATION FOR THE SYNTHESIS OF COMBINED HEAT AND POWER-SYSTEMS WITH MINIMUM ANNUAL COST, Computers & chemical engineering, 21, 1997, pp. 481-486
Citation: E. Sanmarti et al., BATCH-PRODUCTION AND PREVENTIVE MAINTENANCE SCHEDULING UNDER EQUIPMENT FAILURE UNCERTAINTY, Computers & chemical engineering, 21(10), 1997, pp. 1157-1168
Citation: M. Graells et al., SEQUENCING INTERMEDIATE PRODUCTS - A PRACTICAL SOLUTION FOR MULTIPURPOSE PRODUCTION SCHEDULING, Computers & chemical engineering, 20, 1996, pp. 1137-1142
Citation: R. Grau et al., COMPLETION TIMES IN MULTIPURPOSE BATCH PLANTS WITH SET-UP, TRANSFER AND CLEANUP TIMES, Computers & chemical engineering, 20, 1996, pp. 1143-1148
Authors:
SANMARTI E
HUERCIO A
ESPUNA A
PUIGJANER L
Citation: E. Sanmarti et al., A COMBINED SCHEDULING REACTIVE SCHEDULING STRATEGY TO MINIMIZE THE EFFECT OF PROCESS OPERATIONS UNCERTAINTY IN BATCH PLANTS, Computers & chemical engineering, 20, 1996, pp. 1263-1268
Citation: A. Palau et al., USE OF NEURAL NETWORKS FOR PREDICTING THE PERFORMANCE OF DISCONTINUOUS GAS-SOLID CHILLING MACHINES, Computers & chemical engineering, 20, 1996, pp. 297-302
Authors:
MEHLHORN A
ESPUNA A
BONSFILLS A
GORAK A
PUIGJANER L
Citation: A. Mehlhorn et al., MODELING AND EXPERIMENTAL VALIDATION OF BOTH MASS-TRANSFER AND TRAY HYDRAULICS IN BATCH DISTILLATION, Computers & chemical engineering, 20, 1996, pp. 575-580
Authors:
GRAU R
GRAELLS M
COROMINAS J
ESPUNA A
PUIGJANER L
Citation: R. Grau et al., GLOBAL STRATEGY FOR ENERGY AND WASTE ANALYSIS IN SCHEDULING AND PLANNING OF MULTIPRODUCT BATCH CHEMICAL PROCESSES, Computers & chemical engineering, 20(6-7), 1996, pp. 853-868
Citation: A. Huercio et al., REACTIVE SCHEDULING STRATEGIES IN INTEGRATED BATCH-PRODUCTION CONTROL, Hungarian journal of industrial chemistry, 23(3), 1995, pp. 233-236
Citation: E. Sanmarti et al., EFFECTS OF EQUIPMENT FAILURE UNCERTAINTY IN BATCH-PRODUCTION SCHEDULING, Computers & chemical engineering, 19, 1995, pp. 565-570