AAAAAA

   
Results: 1-25 | 26-31
Results: 1-25/31

Authors: REINA J VELO E PUIGJANER L
Citation: J. Reina et al., KINETIC-STUDY OF THE PYROLYSIS OF WASTE WOOD, Industrial & engineering chemistry research, 37(11), 1998, pp. 4290-4295

Authors: WILKENDORF F ESPUNA A PUIGJANER L
Citation: F. Wilkendorf et al., MINIMIZATION OF THE ANNUAL COST FOR COMPLETE UTILITY SYSTEMS, Chemical engineering research & design, 76(A3), 1998, pp. 239-245

Authors: ESPUNA A DELGADO A PUIGJANER L
Citation: A. Espuna et al., IMPROVED BATCH PROCESS PERFORMANCE BY EVOLUTIONARY MODELING, Computers in industry, 36(3), 1998, pp. 271-278

Authors: BADELL M NOUGUES JM PUIGJANER L
Citation: M. Badell et al., INTEGRATED ON LINE PRODUCTION AND FINANCIAL SCHEDULING WITH INTELLIGENT AUTONOMOUS AGENT BASED INFORMATION-SYSTEM, Computers & chemical engineering, 22, 1998, pp. 271-277

Authors: GRAELLS M CANTON J PESCHAUD B PUIGJANER L
Citation: M. Graells et al., GENERAL-APPROACH AND TOOL FOR THE SCHEDULING OF COMPLEX PRODUCTION SYSTEMS, Computers & chemical engineering, 22, 1998, pp. 395-402

Authors: MEHLHORN A NOUGUES JM PUIGJANER L
Citation: A. Mehlhorn et al., USING RATE-BASED APPROACH UNDER CONSIDERATION OF DIFFERENT CONTACTINGREGIMES FOR MULTICOMPONENT BATCH DISTILLATION SIMULATION, Computers & chemical engineering, 22, 1998, pp. 645-648

Authors: SANMARTI E FRIEDLER F PUIGJANER L
Citation: E. Sanmarti et al., COMBINATORIAL TECHNIQUE FOR SHORT-TERM SCHEDULING OF MULTIPURPOSE BATCH PLANTS BASED ON SCHEDULE-GRAPH REPRESENTATION, Computers & chemical engineering, 22, 1998, pp. 847-850

Authors: CALDERON Z ESPUNA A PUIGJANER L
Citation: Z. Calderon et al., WASTE ANALYSIS AND MINIMIZATION IN BATCH AND SEMIBATCH REACTOR OPERATION THROUGH DYNAMIC SIMULATION AND NEURAL NETWORKS, Computers & chemical engineering, 22, 1998, pp. 977-980

Authors: PUIGJANER L ESPUNA A
Citation: L. Puigjaner et A. Espuna, PROSPECTS FOR INTEGRATED MANAGEMENT AND CONTROL OF TOTAL SITES IN THEBATCH MANUFACTURING-INDUSTRY, Computers & chemical engineering, 22(1-2), 1998, pp. 87-107

Authors: REINA J VELO E PUIGJANER L
Citation: J. Reina et al., THERMOGRAVIMETRIC STUDY OF THE PYROLYSIS OF WASTE WOOD, Thermochimica acta, 320(1-2), 1998, pp. 161-167

Authors: KLEMES J DHOLE VR RAISSI K PERRY SJ PUIGJANER L
Citation: J. Klemes et al., TARGETING AND DESIGN METHODOLOGY FOR REDUCTION OF FUEL, POWER AND CO2ON TOTAL SITES, Applied thermal engineering, 17(8-10), 1997, pp. 993-1003

Authors: PUIGJANER L
Citation: L. Puigjaner, PROCESS INTEGRATION WITH COMBINED HEAT AND POWER (CHP), Applied thermal engineering, 17(8-10), 1997, pp. 1015-1034

Authors: WILKENDORF F COROMINAS J ESPUNA A PUIGJANER L
Citation: F. Wilkendorf et al., A GENERAL FORMULATION FOR THE SYNTHESIS OF COMBINED HEAT AND POWER-SYSTEMS WITH MINIMUM ANNUAL COST, Computers & chemical engineering, 21, 1997, pp. 481-486

Authors: ALMATO M SANMARTI E ESPUNA A PUIGJANER L
Citation: M. Almato et al., RATIONALIZING THE WATER-USE IN THE BATCH PROCESS INDUSTRY, Computers & chemical engineering, 21, 1997, pp. 971-976

Authors: SANMARTI E ESPUNA A PUIGJANER L
Citation: E. Sanmarti et al., BATCH-PRODUCTION AND PREVENTIVE MAINTENANCE SCHEDULING UNDER EQUIPMENT FAILURE UNCERTAINTY, Computers & chemical engineering, 21(10), 1997, pp. 1157-1168

Authors: GRAELLS M ESPUNA A PUIGJANER L
Citation: M. Graells et al., SEQUENCING INTERMEDIATE PRODUCTS - A PRACTICAL SOLUTION FOR MULTIPURPOSE PRODUCTION SCHEDULING, Computers & chemical engineering, 20, 1996, pp. 1137-1142

Authors: GRAU R ESPUNA A PUIGJANER L
Citation: R. Grau et al., COMPLETION TIMES IN MULTIPURPOSE BATCH PLANTS WITH SET-UP, TRANSFER AND CLEANUP TIMES, Computers & chemical engineering, 20, 1996, pp. 1143-1148

Authors: SANMARTI E HUERCIO A ESPUNA A PUIGJANER L
Citation: E. Sanmarti et al., A COMBINED SCHEDULING REACTIVE SCHEDULING STRATEGY TO MINIMIZE THE EFFECT OF PROCESS OPERATIONS UNCERTAINTY IN BATCH PLANTS, Computers & chemical engineering, 20, 1996, pp. 1263-1268

Authors: PALAU A DELGADO A VELO E PUIGJANER L
Citation: A. Palau et al., USE OF NEURAL NETWORKS FOR PREDICTING THE PERFORMANCE OF DISCONTINUOUS GAS-SOLID CHILLING MACHINES, Computers & chemical engineering, 20, 1996, pp. 297-302

Authors: MEHLHORN A ESPUNA A BONSFILLS A GORAK A PUIGJANER L
Citation: A. Mehlhorn et al., MODELING AND EXPERIMENTAL VALIDATION OF BOTH MASS-TRANSFER AND TRAY HYDRAULICS IN BATCH DISTILLATION, Computers & chemical engineering, 20, 1996, pp. 575-580

Authors: GRAU R GRAELLS M COROMINAS J ESPUNA A PUIGJANER L
Citation: R. Grau et al., GLOBAL STRATEGY FOR ENERGY AND WASTE ANALYSIS IN SCHEDULING AND PLANNING OF MULTIPRODUCT BATCH CHEMICAL PROCESSES, Computers & chemical engineering, 20(6-7), 1996, pp. 853-868

Authors: PAN YG VELO E PUIGJANER L
Citation: Yg. Pan et al., PYROLYSIS OF BLENDS OF BIOMASS WITH POOR COALS, Fuel, 75(4), 1996, pp. 412-418

Authors: HUERCIO A ESPUNA A PUIGJANER L
Citation: A. Huercio et al., REACTIVE SCHEDULING STRATEGIES IN INTEGRATED BATCH-PRODUCTION CONTROL, Hungarian journal of industrial chemistry, 23(3), 1995, pp. 233-236

Authors: HERMES HD PARES JA VELO E PUIGJANER L
Citation: Hd. Hermes et al., MODELING AND SIZING OF GAS-SOLID CHILLING MACHINES, Computers & chemical engineering, 19, 1995, pp. 333-338

Authors: SANMARTI E ESPUNA A PUIGJANER L
Citation: E. Sanmarti et al., EFFECTS OF EQUIPMENT FAILURE UNCERTAINTY IN BATCH-PRODUCTION SCHEDULING, Computers & chemical engineering, 19, 1995, pp. 565-570
Risultati: 1-25 | 26-31