Citation: Je. Quandt et al., CARDIORESPIRATORY AND ANESTHETIC EFFECTS OF PROPOFOL AND THIOPENTAL IN DOGS, American journal of veterinary research, 59(9), 1998, pp. 1137-1143
Citation: Pk. Hendrix et Ep. Robinson, EFFECTS OF A SELECTIVE AND A NONSELECTIVE MUSCARINIC CHOLINERGIC ANTAGONIST ON HEART-RATE AND INTESTINAL MOTILITY IN DOGS, Journal of veterinary pharmacology and therapeutics, 20(5), 1997, pp. 387-395
Citation: M. Swink et Ep. Robinson, COMPLEXITY FACTORS AND INTUITION-BASED METHODS FOR FACILITY NETWORK DESIGN, Decision sciences, 28(3), 1997, pp. 583-614
Citation: Ep. Robinson et Ll. Gao, A DUAL ASCENT PROCEDURE FOR MULTIPRODUCT DYNAMIC DEMAND COORDINATED REPLENISHMENT WITH BACKLOGGING, Management science, 42(11), 1996, pp. 1556-1564
Authors:
HENDRIX PK
RAFFE MR
ROBINSON EP
FELICE LJ
RANDALL DA
Citation: Pk. Hendrix et al., EPIDURAL ADMINISTRATION OF BUPIVACAINE, MORPHINE, OR THEIR COMBINATION FOR POSTOPERATIVE ANALGESIA IN DOGS, Journal of the American Veterinary Medical Association, 209(3), 1996, pp. 598
Citation: Pk. Hendrix et al., METHOCTRAMINE, A CARDIOSELECTIVE MUSCARINIC CHOLINERGIC ANTAGONIST, PREVENTS FENTANYL-INDUCED BRADYCARDIA IN THE DOG, Journal of veterinary pharmacology and therapeutics, 18(2), 1995, pp. 87-93
Citation: Ep. Robinson et Ll. Gao, LOCATION OF COMPUTERS AND MULTIPLE FILES IN DISTRIBUTED COMPUTER-SYSTEMS, Mathematical and computer modelling, 20(7), 1994, pp. 111-120
Citation: Ep. Robinson et M. Swink, REASON BASED SOLUTIONS AND THE COMPLEXITY OF DISTRIBUTION NETWORK DESIGN-PROBLEMS, European journal of operational research, 76(3), 1994, pp. 393-409
Citation: Ll. Gao et Ep. Robinson, UNCAPACITATED FACILITY LOCATION - GENERAL-SOLUTION PROCEDURE AND COMPUTATIONAL EXPERIENCE, European journal of operational research, 76(3), 1994, pp. 410-427
Citation: Je. Quandt et al., BUTORPHANOL DOES NOT REDUCE THE MINIMUM ALVEOLAR CONCENTRATION OF HALOTHANE IN DOGS, Veterinary surgery, 23(2), 1994, pp. 156-159
Citation: Ll. Gao et Ep. Robinson, AN ARBORESCENT NETWORK FORMULATION AND DUAL ASCENT BASED PROCEDURE FOR THE 2-STAGE MULTIITEM DYNAMIC DEMAND LOTSIZE PROBLEM, Decision sciences, 25(1), 1994, pp. 103-121