Citation: Jr. Crookall, ENGINEERING THE INTEGRATION OF MANUFACTURING EDUCATION AND INDUSTRY, Journal of manufacturing systems, 13(1), 1994, pp. 180000001-180000003
Citation: Ac. Lin et Tc. Chang, 3D MAPS - 3-DIMENSIONAL MECHANICAL ASSEMBLY PLANNING SYSTEM, Journal of manufacturing systems, 12(6), 1993, pp. 437-456
Citation: Sh. Suh et al., PROTOTYPE INTEGRATED ROBOTIC PAINTING SYSTEM - SOFTWARE AND HARDWARE DEVELOPMENT, Journal of manufacturing systems, 12(6), 1993, pp. 463-473
Citation: Pk. Johri, PRACTICAL ISSUES IN SCHEDULING AND DISPATCHING IN SEMICONDUCTOR WAFERFABRICATION, Journal of manufacturing systems, 12(6), 1993, pp. 474-485
Citation: J. Abouhanna et al., DYNAMIC BEHAVIOR AND CREEP CHARACTERISTICS OF FLEXIBLE PARTICULATE BED FIXTURES, Journal of manufacturing systems, 12(6), 1993, pp. 496-505
Authors:
BOUCHER TO
LUXHOJ JT
DESCOVICH T
LITMAN N
Citation: To. Boucher et al., MULTICRITERIA EVALUATION OF AUTOMATED FILLING SYSTEMS - A CASE-STUDY, Journal of manufacturing systems, 12(5), 1993, pp. 357-378
Citation: J. Lee et Bm. Kramer, ANALYSIS OF MACHINE DEGRADATION USING A NEURAL-NETWORK-BASED PATTERN-DISCRIMINATION MODEL, Journal of manufacturing systems, 12(5), 1993, pp. 379-387
Citation: C. Chandra et al., CLUSTERING EFFECTIVENESS OF PERMUTATION GENERATION HEURISTICS FOR MACHINE-PART MATRIX CLUSTERING, Journal of manufacturing systems, 12(5), 1993, pp. 388-408
Citation: Lsb. King et I. Hutter, THEORETICAL APPROACH FOR GENERATING OPTIMAL FIXTURING LOCATIONS FOR PRISMATIC WORKPARTS IN AUTOMATED ASSEMBLY, Journal of manufacturing systems, 12(5), 1993, pp. 409-416
Citation: X. Li, MODELING THE JOINT OF TOOL-WORK INTERFACE FRICTION AND WORK MATERIAL BULK DEFORMATION IN METAL-WORKING PROCESSES (VOL 12, PG 229, 1993), Journal of manufacturing systems, 12(5), 1993, pp. 436-436
Authors:
MATSUMURA T
OBIKAWA T
SHIRAKASHI T
USUI E
Citation: T. Matsumura et al., AUTONOMOUS TURNING OPERATION PLANNING WITH ADAPTIVE PREDICTION OF TOOL WEAR AND SURFACE-ROUGHNESS (VOL 12, PG 253, 1993), Journal of manufacturing systems, 12(5), 1993, pp. 436-436
Authors:
HANSEN F
PAVLAKOS E
HOFFMAN E
KANADE T
REDDY R
WRIGHT P
Citation: F. Hansen et al., PARES - A PROTOTYPING AND REVERSE ENGINEERING SYSTEM FOR MECHANICAL PARTS-ON-DEMAND ON THE NATIONAL NETWORK, Journal of manufacturing systems, 12(4), 1993, pp. 269-281
Citation: Tw. Liao et Lj. Chen, AN EVALUATION OF ART1 NEURAL MODELS FOR GT PART FAMILY AND MACHINE CELL FORMING, Journal of manufacturing systems, 12(4), 1993, pp. 282-290
Citation: F. Taghabonidutta et Jma. Tanchoco, CONGESTION CONTROL POLICY FOR AUTOMATED MANUFACTURING SYSTEMS, Journal of manufacturing systems, 12(4), 1993, pp. 305-314
Citation: R. Vancheeswaran et Ma. Townsend, 2-STAGE HEURISTIC-PROCEDURE FOR SCHEDULING JOB SHOPS, Journal of manufacturing systems, 12(4), 1993, pp. 315-325
Citation: Kr. Raju et Ovk. Chetty, PRIORITY NETS FOR SCHEDULING FLEXIBLE MANUFACTURING SYSTEMS, Journal of manufacturing systems, 12(4), 1993, pp. 326-340
Citation: Md. Reimann et J. Sarkis, AN ARCHITECTURE FOR INTEGRATED AUTOMATED QUALITY-CONTROL, Journal of manufacturing systems, 12(4), 1993, pp. 341-355