Citation: P. Wang et R. Billinton, Time-sequential simulation technique for rural distribution system reliability cost/worth evaluation including wind generation as alternative supply, IEE P-GEN T, 148(4), 2001, pp. 355-360
Citation: R. Billinton et W. Zhang, Adequacy equivalent development of composite generation and transmission systems, RELIAB ENG, 74(1), 2001, pp. 1-12
Authors:
Billinton, R
Fotuhi-Firuzabad, M
Bertling, L
Citation: R. Billinton et al., Bibliography on the application of probability methods in power system reliability evaluation 1996-1999, IEEE POW SY, 16(4), 2001, pp. 595-602
Authors:
Endrenyi, J
Aboresheid, S
Allan, RN
Anders, GJ
Asgarpoor, S
Billinton, R
Chowdhury, N
Dialynas, EN
Fipper, M
Fletcher, RH
Grigg, C
McCalley, J
Meliopoulos, S
Mielnik, TC
Nitu, P
Rau, N
Reppen, ND
Salvaderi, L
Schneider, A
Singh, C
Citation: J. Endrenyi et al., The present status of maintenance strategies and the impact of maintenanceon reliability, IEEE POW SY, 16(4), 2001, pp. 638-646
Citation: R. Billinton et J. Pan, Application of Monte Carlo simulation to optimal maintenance scheduling ina parallel-redundant system, IEE P-GEN T, 147(5), 2000, pp. 274-278
Citation: P. Wang et R. Billinton, Optimum load-shedding technique to reduce the total customer interruption cost in a distribution system, IEE P-GEN T, 147(1), 2000, pp. 51-56
Authors:
Fotuhi-Firuzabad, M
Billinton, R
Faried, SO
Citation: M. Fotuhi-firuzabad et al., Subtransmission system reliability enhancement using a thyristor controlled series capacitor, IEEE POW D, 15(1), 2000, pp. 443-449
Authors:
Faried, SO
Billinton, R
Aboreshaid, S
Fotuhi-Firuzabad, M
Citation: So. Faried et al., Effect of adaptive short time compensation on the stochastic behavior of turbine-generator shaft torsional torques, IEEE EN CON, 15(3), 2000, pp. 305-311
Citation: Mk. Pandey et R. Billinton, Electric power system reliability criteria determination in a developing country - An investigation in Nepal, IEEE EN CON, 15(3), 2000, pp. 342-347
Citation: M. Fotuhi-firuzabad et R. Billinton, Impact of load management on composite system reliability evaluation short-term operating benefits, IEEE POW SY, 15(2), 2000, pp. 858-864
Authors:
da Silva, AML
Manso, LAD
Mello, JCD
Billinton, R
Citation: Aml. Da Silva et al., Pseudo-chronological simulation for composite reliability analysis with time varying loads, IEEE POW SY, 15(1), 2000, pp. 73-80
Citation: R. Billinton et W. Zhang, State extension for adequacy evaluation of composite power systems-applications, IEEE POW SY, 15(1), 2000, pp. 427-432
Citation: R. Billinton et W. Zhang, Cost-related reliability evaluation of interconnected bulk power systems using an equivalent approach, ELEC MACH P, 28(9), 2000, pp. 793-810
Citation: P. Wang et al., Evaluation of probability distributions of distribution system reliabilityindices considering WTG as alternative supply, ELEC MACH P, 28(10), 2000, pp. 901-913
Citation: R. Billinton et M. Pandey, Generating capacity planning criteria determination for developing countries: Case study of Nepal, IEE P-GEN T, 146(5), 1999, pp. 491-495
Citation: R. Billinton et P. Wang, Reliability worth of distribution system network reinforcement consideringdispersed customer cost date, IEE P-GEN T, 146(3), 1999, pp. 318-324
Citation: M. Fotuhi-firuzabad et R. Billinton, Unit commitment health analysis in composite generation and transmission systems considering stand-by units, IEE P-GEN T, 146(2), 1999, pp. 164-168