AAAAAA

   
Results: 1-25 | 26-50 | 51-51
Results: 1-25/51

Authors: Zhang, W Billinton, R
Citation: W. Zhang et R. Billinton, Effects of rounding adequacy equivalents of composite power systems, EL POW CO S, 29(6), 2001, pp. 503-516

Authors: Wang, P Billinton, R
Citation: P. Wang et R. Billinton, Impacts of station-related failures on distribution system reliability, EL POW CO S, 29(11), 2001, pp. 965-976

Authors: Wang, P Billinton, R
Citation: P. Wang et R. Billinton, Time-sequential simulation technique for rural distribution system reliability cost/worth evaluation including wind generation as alternative supply, IEE P-GEN T, 148(4), 2001, pp. 355-360

Authors: Billinton, R Zhang, W
Citation: R. Billinton et W. Zhang, Adequacy equivalent development of composite generation and transmission systems, RELIAB ENG, 74(1), 2001, pp. 1-12

Authors: Wang, P Billinton, R
Citation: P. Wang et R. Billinton, Reliability benefit analysis of adding WTG to a distribution system, IEEE EN CON, 16(2), 2001, pp. 134-139

Authors: Billinton, R Fotuhi-Firuzabad, M Bertling, L
Citation: R. Billinton et al., Bibliography on the application of probability methods in power system reliability evaluation 1996-1999, IEEE POW SY, 16(4), 2001, pp. 595-602

Authors: Endrenyi, J Aboresheid, S Allan, RN Anders, GJ Asgarpoor, S Billinton, R Chowdhury, N Dialynas, EN Fipper, M Fletcher, RH Grigg, C McCalley, J Meliopoulos, S Mielnik, TC Nitu, P Rau, N Reppen, ND Salvaderi, L Schneider, A Singh, C
Citation: J. Endrenyi et al., The present status of maintenance strategies and the impact of maintenanceon reliability, IEEE POW SY, 16(4), 2001, pp. 638-646

Authors: Billinton, R Karki, R
Citation: R. Billinton et R. Karki, Capacity expansion of small isolated power systems using PV and wind energy, IEEE POW SY, 16(4), 2001, pp. 892-897

Authors: Billinton, R Zhang, W
Citation: R. Billinton et W. Zhang, Cost related reliability evaluation of bulk power systems, INT J ELEC, 23(2), 2001, pp. 99-112

Authors: Billinton, R Pan, J
Citation: R. Billinton et J. Pan, Application of Monte Carlo simulation to optimal maintenance scheduling ina parallel-redundant system, IEE P-GEN T, 147(5), 2000, pp. 274-278

Authors: Wang, P Billinton, R
Citation: P. Wang et R. Billinton, Optimum load-shedding technique to reduce the total customer interruption cost in a distribution system, IEE P-GEN T, 147(1), 2000, pp. 51-56

Authors: Fotuhi-Firuzabad, M Billinton, R Faried, SO
Citation: M. Fotuhi-firuzabad et al., Subtransmission system reliability enhancement using a thyristor controlled series capacitor, IEEE POW D, 15(1), 2000, pp. 443-449

Authors: Faried, SO Billinton, R Aboreshaid, S Fotuhi-Firuzabad, M
Citation: So. Faried et al., Effect of adaptive short time compensation on the stochastic behavior of turbine-generator shaft torsional torques, IEEE EN CON, 15(3), 2000, pp. 305-311

Authors: Pandey, MK Billinton, R
Citation: Mk. Pandey et R. Billinton, Electric power system reliability criteria determination in a developing country - An investigation in Nepal, IEEE EN CON, 15(3), 2000, pp. 342-347

Authors: Fotuhi-Firuzabad, M Billinton, R
Citation: M. Fotuhi-firuzabad et R. Billinton, Impact of load management on composite system reliability evaluation short-term operating benefits, IEEE POW SY, 15(2), 2000, pp. 858-864

Authors: da Silva, AML Manso, LAD Mello, JCD Billinton, R
Citation: Aml. Da Silva et al., Pseudo-chronological simulation for composite reliability analysis with time varying loads, IEEE POW SY, 15(1), 2000, pp. 73-80

Authors: Billinton, R Fotuhi-Finuzabad, M Faried, SO Aboreshaid, S
Citation: R. Billinton et al., Impact of unified power flow controllers on power system reliability, IEEE POW SY, 15(1), 2000, pp. 410-415

Authors: Billinton, R Zhang, W
Citation: R. Billinton et W. Zhang, State extension for adequacy evaluation of composite power systems-applications, IEEE POW SY, 15(1), 2000, pp. 427-432

Authors: Billinton, R Zhang, W
Citation: R. Billinton et W. Zhang, Cost-related reliability evaluation of interconnected bulk power systems using an equivalent approach, ELEC MACH P, 28(9), 2000, pp. 793-810

Authors: Wang, P Goel, L Billinton, R
Citation: P. Wang et al., Evaluation of probability distributions of distribution system reliabilityindices considering WTG as alternative supply, ELEC MACH P, 28(10), 2000, pp. 901-913

Authors: Billinton, R Fotuhi-Firuzabad, M
Citation: R. Billinton et M. Fotuhi-firuzabad, A reliability framework for generating unit commitment, ELEC POW SY, 56(1), 2000, pp. 81-88

Authors: Allan, R Billinton, R
Citation: R. Allan et R. Billinton, Probabilistic assessment of power systems, P IEEE, 88(2), 2000, pp. 140-162

Authors: Billinton, R Pandey, M
Citation: R. Billinton et M. Pandey, Generating capacity planning criteria determination for developing countries: Case study of Nepal, IEE P-GEN T, 146(5), 1999, pp. 491-495

Authors: Billinton, R Wang, P
Citation: R. Billinton et P. Wang, Reliability worth of distribution system network reinforcement consideringdispersed customer cost date, IEE P-GEN T, 146(3), 1999, pp. 318-324

Authors: Fotuhi-Firuzabad, M Billinton, R
Citation: M. Fotuhi-firuzabad et R. Billinton, Unit commitment health analysis in composite generation and transmission systems considering stand-by units, IEE P-GEN T, 146(2), 1999, pp. 164-168
Risultati: 1-25 | 26-50 | 51-51