Citation: Jnd. Gupta et J. Ruiz-torres, A LISTFIT heuristic for minimizing makespan on identical parallel machines, PROD PLAN C, 12(1), 2001, pp. 28-36
Citation: Jnd. Gupta et Jc. Ho, Minimizing makespan subject to minimum flowtime on two identical parallel machines, COMPUT OPER, 28(7), 2001, pp. 705-717
Authors:
Amba-Rao, SC
Petrick, JA
Gupta, JND
Von der Embse, TJ
Citation: Sc. Amba-rao et al., Comparative performance appraisal practices and management values among foreign and domestic firms in India, INT J HUM R, 11(1), 2000, pp. 60-89
Citation: Ka. Smith et Jnd. Gupta, Neural networks in business: techniques and applications for the operations researcher, COMPUT OPER, 27(11-12), 2000, pp. 1023-1044
Citation: Jnd. Gupta et al., Bicriteria optimisation of the makespan and mean flowtime on two identicalparallel machines, J OPER RES, 51(11), 2000, pp. 1330-1339
Citation: Rs. Sexton et Jnd. Gupta, Comparative evaluation of genetic algorithm and backpropagation for training neural networks, INF SCI, 129(1-4), 2000, pp. 45-59
Citation: Jnd. Gupta et al., Designing a tabu search algorithm for the two-stage flow shop problem withsecondary criterion, PROD PLAN C, 10(3), 1999, pp. 251-265
Citation: Jnd. Gupta et Rs. Sexton, Comparing backpropagation with a genetic algorithm for neural network training, OMEGA-INT J, 27(6), 1999, pp. 679-684
Citation: Jnd. Gupta et al., Single-machine scheduling to minimize maximum tardiness with minimum number of tardy jobs, ANN OPER R, 92, 1999, pp. 107-123
Citation: Jnd. Gupta et al., Part dispatching and machine loading in flexible manufacturing systems using central queues, INT J PROD, 37(6), 1999, pp. 1427-1435