AAAAAA

   
Results: 1-5 |
Results: 5

Authors: Teo, CY Shen, W
Citation: Cy. Teo et W. Shen, Development of an interactive rule-based system for bulk power system restoration, IEEE POW SY, 15(2), 2000, pp. 646-653

Authors: Wu, H Gooi, HB Teo, CY
Citation: H. Wu et al., Optimal scheduling of spinning reserve with transmission constraints, ELEC MACH P, 28(9), 2000, pp. 823-837

Authors: Teo, CY He, BG
Citation: Cy. Teo et Bg. He, A database approach integrating a visually interactive load flow for low voltage system, ELEC MACH P, 28(3), 2000, pp. 265-276

Authors: Teo, CY Shen, W
Citation: Cy. Teo et W. Shen, Real-time generation and supervision of a dynamic restoration plan for bulk-power systems, ELEC POW SY, 53(2), 2000, pp. 113-122

Authors: Teo, CY He, BG
Citation: Cy. Teo et Bg. He, Integrating three-phase load flow and short-circuit current calculation for a low voltage system, ELEC POW SY, 53(2), 2000, pp. 123-132
Risultati: 1-5 |